1 2664/1419/DPE/US AID 1967 TEST INSTRUMENTS US$ 40,780.00 COMPLETED
2 2683/1374/A/DPE/US AID 1968 UNDERGROUND CABLES 15KV US$ 407,000.00 COMPLETED
3 2695/1432/DPE/US AID 1968 CLAMPS, DEADEND 11 KV US$ 11,087.00 COMPLETED
4 2727/DPE 1968 GENERATING SETS RS. 350,000.00 COMPLETED
5 2731/DPE 1968 H.T. COMPOUND US$ 6,041.00 COMPLETED
6 2764/DPE 1968 LOAD BREAK FUSE 15 KV US$ 22,222.00 COMPLETED
7 2767/DPE 1968 FUSE CUTOUTS 15KV US$ 580,801.00 COMPLETED
8 2782/DPE 1968 CONDUCTOR HARDWARE 132KV & 220 KV US$ 62,201.00 COMPLETED
9 2836/DPE 1969 MOBILE GENERATING SETS US$ 10,830.00 COMPLETED
10 2850/DPE 1969 LINE TOOLS AND EQUIPMENT US$ 16,289.00 COMPLETED
11 2859/DPE 1969 CABLE TEST EQUIPMENT US$ 20,525.00 COMPLETED
12 2900/DPE 1969 REPRODUCTION EQUIPMENT US$ 8,720.00 COMPLETED
13 2905/DPE 1969 TEST METERS US$ 11,194.00 COMPLETED
14 2909/DPE 1969 SPARE PARTS (GE USA) US$ 10,085.00 COMPLETED
15 2915/DPE 1969 LINE TOOLS US$ 89,720.00 COMPLETED
16 SCARP/US AID 1970 X’ARMS, BORED (WOODEN) 11& 32KV US$ 97,695.00 COMPLETED
17 2909/DPE 1970 PHOTO CONTROL UNITS US$ 10,085.00 COMPLETED
18 TLM/108 (CE GSC) 1970 CONDUCTOR GROUND WIRE US$ 116,382.00 COMPLETED
19 TLM/112 (CE GSC) 1970 ELECTRICAL EQUIPMENT US$ 22,603.00 COMPLETED
20 3028/DPE/USAID 1971 PHOTO CONTROL UNITS US$ 7,910.00 COMPLETED
21 RTL/PO-7 1971 VOLTMETERS US$ 735 COMPLETED
22 2911/DPE/USAID 1971 PHOTO CONTROL UNITS US$ 10,000.00 COMPLETED
23 IDA-01 LOT II 1972 132/11KV, 20/26MVA,(14) P/TRANSFORMERS (TURNKEY) US$ 1,400,000.00 COMPLETED
24 IDA-02 LOT III 1972 132/66/11KV,(12) 132KV S/STATIONS (TURNKEY) US$ 2,000,000.00 COMPLETED
25 IDA-05 LOT I 1972 132/11KV, 10/13 MVA, (6) P/ TRANSFORMERS (TURNKEY) US$ 580,000.00 COMPLETED
26 PR/TR/11 1972 B.G. HARD WOOD SLEEPERS 11KV & 32KV SING. $ 2,553,090.00 COMPLETED
27 SW-1267 1973 FERTILIZER (UREA) US$ 392,222.00 COMPLETED
28 IDA-06 LOT II 1973 132/66/11KV (9) S/STATIONS (TURNKEY) US$ 1,429,209.00 COMPLETED
29 SW-1293 1973 FERTILIZER (DAP) C$ 1,172,980.00 COMPLETED
30 SW-1296 1973 FERTILIZER (UREA) US$ 811,762.00 COMPLETED
31 PD/PCPP 1974 600 TONS P.C. WIRE US$ 327,000.00 COMPLETED
32 ASO 1284 1974 FERTILIZER US$ 570,000.00 COMPLETED
33 FDAS-1444/3 1975 FERTILIZER (NP:23:23) US$ 1,782,000.00 COMPLETED
34 IBS (INDUS BASIN SURVEY) 1975 AERIAL PHOTOGRAPHY(80,000 SQR.MILES) US$ 1,000,000.00 COMPLETED
35 PR-11/74-TR/2 1975 7101 NOS SPECIAL TIMBER FOR RAILWAYS CROSSINGS S.$ 420,686.00 COMPLETED
36 10552-67/1 1976 OIL DEHYDRATION PLANTS (TPS LYALLPUR) JY 7,786,909.00 COMPLETED
37 10553-51 1976 OIL DEHYDRATION PLANTS (TPS QUETTA) JY 7,786,909.00 COMPLETED
38 773/CET(1976) 1976 STORAGE BATTERIES FOR P/STATION 132 & 110V, 55AH US$ 54,651.00 COMPLETED
39 FDAS-1553/8 1976 FERTILIZER (NP:23:23) US$ 6,721,312.00 COMPLETED
40 FDAS-1553/9 1976 FERTILIZER (NP:23:23) US$ 3,734,062.00 COMPLETED
41 FDAS-1644/6 1976 FERTILIZER (NP:23:23) US$ 1,158,675.00 COMPLETED
42 193/CEGSO/P&S 1977 SPARE PARTS FOR CIRCUIT BREAKERS US$ 155,930.00 COMPLETED
43 3468/DPE 1977 T/l HAREWARE 132KV & 220KV FFR 283,372.35 COMPLETED
44 913/CEGSO 1977 SPARES FOR SUBSTATION US$ 192,099.00 COMPLETED
45 917/CET 1977 DEHYDRATION PLANTS SFR 52,771.38 COMPLETED
46 PD/GSC-213/PAK 1978 SPARES PARTS FOR SUBSTATION US$ 5,526.86 COMPLETED
47 PR-II/77-TR/11 1978 B.G. HARDWOOD SLEEPERS S.$ 2,533,490.00 COMPLETED
48 1933-5/TR-8 1979 FORK LIFTERS FOR SUBSTATION JY 2,854,000.00 COMPLETED
49 276/CEGSO 1979 SPARE PARTS FOR SUBSTATION US$ 18,052.00 COMPLETED
50 290/CEGSO 1980 SPARES PART FOR SUBSTATION US$ 192,099.93 COMPLETED
51 295/CEGSO 1980 SPARE PARTS FOR SUBSTATION US$ 9,860.00 COMPLETED
52 500KV BOOSTING (MITSUBISHI) 1980 SUB STATION EQUIPMENT, 500 KV US$ 10,000,000.00 COMPLETED
53 307 LOT-I 1980 STATION BATTERIES 132KV & 110V, 55AH DM 717,974.00 COMPLETED
54 1389-A/CET 1981 ALUMINIUM BRASS TUBES JY 1,600,000.00 COMPLETED
55 3816/CES 1981 SHORT CIRCUTTING AND GROUNDING SETS FFR 1,752,480.00 COMPLETED
56 312 LOT-II 1981 FORK LIFTERS JY 27,249,149.00 COMPLETED
57 3852/CES 1981 200,000 NOS. S/PHASE ENERGY METERS JY 233,500,000.00 COMPLETED
58 3866/DGM 1981 LEATHER SAFTY BELTS FOR LINE MEN FFr 1,170,000.00 COMPLETED
59 501 LOT I & II 1981 STATION CONNECTORS 132KV & 220KV FFr 3,444,006.00 COMPLETED
60 1880/GMT 1982 ALUMINIUM BRASS TUBES JY 53,222,400.00 COMPLETED
61 318 LOT-I 1982 STATION BATTERIES 132KV & 220KV, (110V, 55AH) US$ 173,103.51 COMPLETED
62 307 LOT-I 1982 STATION BATTERIES (ADD.)132KV,110V, 55 AH US$ 91,248.00 COMPLETED
63 9730-45/EXN/TR 1982 INSULATING MATERIAL US$ 41,200.00 COMPLETED
64 3922/CES 1982 33 KV FUSE CUTOUTS J.Y 25,477,275.00 COMPLETED
65 391/0473 1983 COEFFING HOISTS ETC US$ 151,812.00 COMPLETED
66 4007/CES/DPE/2213 1983 DEAD AND CLAMPS. 11 KV FFr 379,665.00 COMPLETED
67 4070/DGM 1983 LEATHER SAFTY BELTS FOR LINE MEN FFr 2,171,360.00 COMPLETED
68 428/ESR 1983 WOODEN CROSSARMS, 11KV & 33KV S.$ 352,184.00 COMPLETED
69 438-42/GM(O) 1983 RESISTANCE TESTERS US$ 38,315.00 COMPLETED
70 561 LOT-VIII 1983 WOODEN CROSSARMS S.$ 945,368.05 COMPLETED
71 561/1(1-2) 1983 11 KV, INSULATED B/ CONDUCTOR & ACCERS. FFr 3,488,760.00 COMPLETED
72 5617/CEGSO/T-59 1983 STATION BATTERIES 132KV & 220KV (110V & 220V) JY 52,367,130.00 COMPLETED
73 4048/CES 1983 THREE PHASE ENERGY METERS J.Y 130,000,000.00 COMPLETED
74 2383/DPE 1983 33KV DROPOUT CUTOUTS J.Y 11,749,280.00 COMPLETED
75 2300/DGM 1984 33KV FUSE CUTOUTS JY 19,262,720.00 COMPLETED
76 3979/CES 1984 TERMINATION KITS, 11KV US$ 54,544.02 COMPLETED
77 504 LOT-lll (A) 1984 SUBSTATION CONNECTORS , 132KV & 220 KV FFr 528,026.04 COMPLETED
78 504/IBRDL-lll 1984 HARDWARE FOR 132KV SUB-STATIONS FFr 571,404.82 COMPLETED
79 GMT/CPP/DUKI 1984 COAL EXPLORATION HOLES DRILLING US$ 2,000,000.00 COMPLETED
80 4224/DGM 1985 11KV DEADEND CLAMPS US$ 129,060.00 COMPLETED
81 4278/DGM 1985 11KV LIGHTING ARRESTORS US$ 33,000.00 COMPLETED
82 561/1 (ADDITIONAL) 1985 WOODEN CROSSARMS, 11KV & 33KV S.$ 243,147.60 COMPLETED
83 C-89/STG 1985 STATION CONNECTORS , 132KV & 220KV FFr 571,904.82 COMPLETED
84 391-K-189/USAID 1986 Bl-NOCULARS US$ 2,112.00 COMPLETED
85 824-87-04 1986 COMPRESSION CONNECTORS, 11KV FFr 153,830.00 COMPLETED
86 401-LOT-V 1987 ISOLATORS, 132KV US$ 919,909.00 COMPLETED
87 406 LOT II & III 1987 STATION HARDWARE & CONNECTOR 132KV&220KV FFr 2,240,816.72 COMPLETED
88 406 LOTS II & III (ADDL) 1987 S/ CONNECTORS & HAREWARE 132KV & 220KV FFr 313,888.84 COMPLETED
89 734/1 LOT-7 1987 COMPRESSION TOOLS FFr 75,250.00 COMPLETED
90 7965/114/EGP-I 1987 DISTRIBUTION TRANSFORMERS US$ 303,877.00 COMPLETED
91 ICC/BIN QASIM (KESC) 1987 T/L S/STEEL HARDWARE AND DAMPER, 220KV FFr 4,589,220.32 COMPLETED
92 230/CE/STG 1988 SPARE PARTS US$ 76,561.60 COMPLETED
93 2309/GMT 1988 125MVA STEPUP TRANSFORMER, 220KV US$ 558,840.00 COMPLETED
94 2698/03 LOT-I 1988 T/L HARDWARE 132 KV & 220 KV FFr 732,610.30 COMPLETED
95 391/0486/USAIA 1988 TTR, RELAYS ETC US$ 38,315.00 COMPLETED
96 391/0486/USAID 1988 TESTING EQUIPMENT US$ 91,886.00 COMPLETED
97 413 LOT-I 1988 132KV CIRCUIT BREAKERS US$ 1,150,000.00 COMPLETED
98 413 LOT-III,CTS, PTS 1988 CTs & PTs & ISOs 132 KV US$ 1,569,249.64 COMPLETED
99 416 LOTS I,II & III 1988 132KV STEEL TOWERS US$ 6,486,448.21 COMPLETED
100 417 LOT-III 1988 S/ CONNECTORS AND HAREWARE 132KV & 220KV FFr 856,627.00 COMPLETED
101 423 LOT-II 1988 11KV STREET STEEL POLES FFr 4,661,763.00 COMPLETED
102 425 LOT I & II 1988 132KV STEEL POLES K.Won 2,387,717.80 COMPLETED
103 566-12 1988 CONDUCTOR ACCESSORIES, 500KV FFr 1,029,027.35 COMPLETED
104 614 LOT-I 1988 ENAMALLED COPPER WIRE US$ 267,075.70 COMPLETED
105 948-50/CE THERMAL 1988 ERW STEEL PIPE JY 42,160,580.00 COMPLETED
106 421 LOT-II 1989 CURRENT AND POTENTIAL TRANSFORMERS 132KV US$ 481,771.40 COMPLETED
107 421 LOT-III 1989 CURRENT TRANSFORMER 132KV US$ 507,636.00 COMPLETED
108 424 LOT-II 1989 AUTO TRANSFORMERS, 220 KV, 160 MVA K.Won ############# COMPLETED
109 505/PAK/(SF)/12 1989 T/L HAREWARE 132KV & 220KV FFr 667,426.00 COMPLETED
110 GSQ/ l 1989 STEEL TOWERS STUBS , 220KV J.Y 55,010,295.75 COMPLETED
111 1389/C&T/T-117 1990 ALUMINIUM BRASS TUBES JY 51,600,000.00 COMPLETED
112 824-108 LOT-ll 1990 132KV CURRENT TRANSFORMERS US$ 258,444.00 COMPLETED
113 824-108 LOT-lll 1990 132 & 66KV ISOLATORS US$ 1,014,807.00 COMPLETED
114 824-109 1990 220 KV S/STATION CONNECTORS RS. 31,003,661.00 COMPLETED
115 903 LOT-l 1990 500KV STEEL TOWERS US$ 1,795,076.76 COMPLETED
116 904 LOT-ll 1990 SHEILDWIRE J.Y 26,611,875.00 COMPLETED
117 GSQ-3 1990 220 KV SUBSTATION EQUIPMENT J.Y 55,458,740.00 COMPLETED
118 1073-3 PACKAGE-lll 1991 CONDUCTOR ACCESSORIES FOR 500KV T/L FFr 2,077,255.90 COMPLETED
119 1073-6 PACKG-ll 1991 500KV T/L HARDWARE FFr 6,338,441.48 COMPLETED
120 1150-12 ITEM-2 1991 500KV/T/L HARDWARE FFr 4,869,452.80 COMPLETED
121 4701/DGM(P)/DPE 1991 TRANSFORMER OIL TREATMENT PLANTS J.Y 40,050,000.00 COMPLETED
122 824-112 LOT 1 1991 BATTERY CHARGERS US$ 111,175.63 COMPLETED
123 903 LOT-ll 1991 220KV STEEL TOWERS US$ 885,146.54 COMPLETED
124 909 LOT-lll 1991 STRING ASSEMBLIES , 132KV & 220KV FFr 150,390.00 COMPLETED
125 910 LOT VI 1991 DEADEND & PG CLAMPS, 11KV FFr 84,300.00 COMPLETED
126 910 LOT-ll 1991 WOODEN CROSSARMS, 11KV & 33KV Sing.$ 102,624.00 COMPLETED
127 ADB-ll-01 LOT-IV 1991 132KV STEEL POLES US$ 2,508,020.00 COMPLETED
128 1073-2 1992 500KV STEEL TOWERS US$ 8,084,027.00 COMPLETED
129 1154-3 LOT-12 1992 WOODEN CROSSARMS, 11KV & 33KV Sing.$ 1,709,520.00 COMPLETED
130 1154-3 LOT-l 1992 WOODEN CROSSARMS Sing.$ 1,058,408.00 COMPLETED
131 ADB-ll-03 LOT-IV 1992 ISOLATORS, 132KV & 66KV US$ 459,356.92 COMPLETED
132 ADB-ll-04 LOT-IV 1992 STOCK BRIDGE DAMPERS, 132KV & 220KV FFr 222,000.00 COMPLETED
133 SSREP/001 1992 CRAWLER CRANES US$ 260,000.00 COMPLETED
134 SSREP/002 1992 MOTOR GRADERS US$ 96,040.00 COMPLETED
135 326/STG 1993 LCM-CPl UNITS N.O.K 1,004,955.00 COMPLETED
136 328/STG 1993 KATO (DEHYDERATION PLANTS) SPARES J.Y 20,365,000.00 COMPLETED
137 506/CEGSO 1993 S/BATTERSIES, 132KV&220KV (110V&220V&55&110AH I.LIRA 8,598,000.00 COMPLETED
138 ADB-ll-05 1993 STRING ASSEMBLIES & S/CONNECTORS,132 & 220KV FFr 3,769,985.70 COMPLETED
139 ADB-ll-05 LOT-VI 1993 CONTROL CABLES US$ 117,676.40 COMPLETED
140 ADB-ll-07 LOT-V 1993 S/BATTERIES,132KV&220KV (110V&220V&55&110AH I. LIRA 191,408,700.00 COMPLETED
141 PR-1/91-TM(Sch.3) 1993 REEHABILITATION OF G.E 416 NOS.T/MOTORS US$ 6,175,609.64 COMPLETED
142 E50 WB2 1994 DEADING CLAMPS ETC, 11KV FFr 112,150.00 COMPLETED
143 1030/S.MODERN (PTCL) 1995 TELECOMMUNICATION CABLES US$ 10,401,523.42 COMPLETED
144 504/IBRD (LOT-l & ll) 1995 S/HARDWIRE AND EARTHING MATERIAL132&220KV FFr 1,625,194.50 COMPLETED
145 505/IBRD L-ll,lll & IV 1995 132KV GRID STATION EQUIPMENTS US$. 1,051,910.70 COMPLETED
146 513/IBRD  LOT III 1995 220KV & 132 KV GROUNDING HARDWARE FFR 1,264,375.40 COMPLETED
147 ADB-11-21LOT II 1995 GRIDSTATION HARDWARE, 132KV FFr 583,677.00 COMPLETED
148 FID-PROC-2-80/5 1995 N.P.K. 10:20:20 Fertilizer US$ 14,948,325.00 COMPLETED
149 1150-22 1996 T/L HARDWARE 500KV FFr 13,490,298.00 COMPLETED
150 19/0155/00-0/1-96 1996 REHABILITATION OF TWO T/ MOTOR US$  FREE OF CHARGE COMPLETED
151 19/0213/04-0/1-91 1996 COMMUTATORS OF TRACTION MOTORS US$ 83,300.00 COMPLETED
152 19/0312/02-0/1-91 1996 COMMUTATOR OF TRACTION MOTORS US$ 43,560.00 COMPLETED
153 19/0591/01-0/1-89 1996 ARMATURE W/ COMMUTATOR & SHAFT KIT-OF T/M US$ 243,000.00 COMPLETED
154 519/IBRD LOT III & IV 1996 132KV AND 66KV ISOLATORS US$ 212,616.00 COMPLETED
155 19/0001/00-0/1-96 1997 COMPLETE KIT P/END. OF TRACTION MOTORS US$ 10,872.00 COMPLETED
156 19/0023/06-0/1-93 1997 REWINDING KITS. OF TRACTION MOTORS US$ 340,000.00 COMPLETED
157 19/0102/00-0/1-95 1997 COMMUTATOR, CAP. INNER BEARING COIL. OF T/M US$ 74,600.00 COMPLETED
158 19/0165/00-0/1-95 1997 CARBON BRUSH HOLDER FOR T/MOTORS US$ 42,880.00 COMPLETED
159 19/0190/01-0/1-95 1997 MAIN POLE WITH CORE, FOR T/MOTORS US$ 154,188.00 COMPLETED
160 19/0190/02-0/1-95 1997 COMMUTATION POLE WITH CORE.FOR T/M US$ 50,999.36 COMPLETED
161 19/0457/02-0/1-91 1997 ARMATURE ASSEMBLY, FOR T/ MOTORS US$ 81,360.00 COMPLETED
162 535/KF LOT IV 1997 ALUMOWELD EARTHWIRE US$ 279,000.00 COMPLETED
163 19/0002/00-0/1-98(FBU) 1998 REHABILITATION OF TRACTION MOTORS (8 Nos.) US$  FREE OF CHARGE COMPLETED
164 19/0030/01-0/1-97 1998 F/COIL, CAP BEARING, ARMATURE SHAFT T/M US$ 123,937.00 COMPLETED
165 19/0190/03-0/1-95 1998 Poly Glass Tape Binding US$                800.00 COMPLETED
166 19/0044/01-0/1-99(PBU) 1999 R/KIT.COILS & COMMUTATOR ASSEMBLY. US$ 181,740.00 COMPLETED
167 19/0046/01-0/1-99 (PBU) 1999 REWINDING KIT AND ARMATURE COIL OF T/M US$ 52,185.00 COMPLETED
168 2017-3 (ITEM 3) 1999 500 KV CONDUCTOR ACCESSORIES (G/ BORATHA) FFr 1,008,286.00 COMPLETED
169 438/CE/STG/DP-l/3751-63 1999 CURRENT PROBES. FOR LCM N.KR 15,900.00 COMPLETED
170 19/0022/01-0/2-2000( R ) 2000 ARAMATURE ASSEMBLY. FOR T/MOTORS US$ 78,360.00 COMPLETED
171 19/0110/01-0/2-2000-K 2001 COILS OF D-77 T/M US$ 4,064.00 COMPLETED
172 528/IBRD(LOT IV) 2000 ALUMOWELD EARTHWIRE US$ 110,000.00 COMPLETED
173 3580/GMT/P&S/GUDDU 2001 11KV, S/ ARRESTORS & COUNTERS FOR G/STATIONS US$ 7,086.00 COMPLETED
174 19/0033/01-0/2-2001( R ) 2001 ARMATURE IN & OUTER BEARING STEPPER. FOR T/M US$ 92,161.70 COMPLETED
175 19/0039/01-0/2-2001( R ) 2001 COMMUTATOR ASSEMBLY COIL W/POLE. FOR T/M. US$ 40,462.00 COMPLETED
176 19/0056/01-0/2-2001( R ) 2001 CONNECTION STRAPS BEARING ETC- T/M A19/A23 US$ 14,124.00 COMPLETED
177 19/0062/01-0/2-2001( R ) 2001 SHAFT UNIT PLUG. FOR TRACTION MOTORS US$ 6,054.78 COMPLETED
178 19/0004/01-0/2-2002-R 2002 COMMUTATOR ASSEMBLY FOR TIG WELIDER D-29 T/M US$ 17,034.00 COMPLETED
179 EM/15/DS-01 2001 WATER METERES US$ 360,644.91 COMPLETED
180 05/0008/01-0/1-2002 2002 R/KITS & ARMATURE ASSEMBLY FOR T/MOTORS. US$ 244,726.32 COMPLETED
181 19/0043/01-0/2-2002( R ) 2002 COIL POLE CABLE ASSEMBLY W/BUSHING FOR T/M US$ 51,367.64 COMPLETED
182 19/0050/01-0/2-2002(R ) 2002 ARMATURE AND COMMUTATING FUIL COIL.FOR T/M US$ 154,362.56 COMPLETED
183 19/0057/01-0/2-2002-R 2002 ARMATURE ASSEMBLY FOR 395 HP HITACHI T/M US$ 76,225.45 COMPLETED
184 19/0063/01-0/2-2002( R ) 2002 SET OF ARMATURE REWINDING KIT. FOR T/MOTORS US$ 280,896.00 COMPLETED
185 19/0070/01-0/2-2002( R ) 2002 ARMATURE ASSEMBLY FOR T/MOTORS US$ 65,023.38 COMPLETED
186 19/0074/01-0/2-2002(R ) 2002 COIL WITH POLE PIECE EXCITING FOR T/MOTORS US$ 22,260.96 COMPLETED
187 19/0088/01-0/2-2003(R ) 2002 ARMATURE AND ARMATURE SHAFT T/ MOTORS US$ 135,430.80 COMPLETED
188 19/0090/01-0/2-2002( R) 2002 ARMATURE REWINDING KIT. FOR T/MOTORS US$ 330,219.60 COMPLETED
189 19/0100/01-0/2-2002(K) 2002 ARAMATURE ASSEMBLY. FOR TRACTION MOTORS US$ 107,460.00 COMPLETED
190 19/0025/01-0/2-2003 2003 ARMATURE ASSEMBLY FOR TRACTION MOTOR US$ 139,942.40 COMPLETED
191 19/0019/01-0/2-2003 2003 ARAMATURE ASEMBLY FOR 395 HP T/M US$ 136,296.00 COMPLETED
192 19/0089/01-0/2-2003 2003 ARMATURE SHAFT US$ 27,570.00 COMPLETED
193 19/0119/01-0/2-2003 2003 COMMUTATORS FOR GE 761 TRACTION MOTORS US$ 336,800.00 COMPLETED
194 19/0097/01-0/2-2003 2003 COMMUTATORS ASSEMBLY OF HITACHI 395 HP T/M US$ 25,254.00 COMPLETED
195 19/0010/01-0/2-2004 2004 COMMUTATORS OF D-29 TRACTION MOTORS US$ 16,434.00 COMPLETED
196 05/0002/01-0/1-2004 2004 SPARE PARTS OF COILS OF EE55 T/M US$ 290,035.00 COMPLETED
197 19/0033/01-0/2-2004 2004 CABLE ASSEMBLY OF 761 A23 T/MOTORS US$ 7,636.00 COMPLETED
198 19/0039/01-0/2-2004 2004 ARMATURE ASSEMBLY OF 761 A23 T/M US$ 453,977.02 COMPLETED
199 19/0053/01-0/2-2004 2004 ARMATURE ASSEMBLY GE761 A23 T/MOTOR US$ 86,666.28 COMPLETED
200 19/0056/01-0/2-2004 2004 REWINDING KIT OF D-29 TRACTION MOTORS US$ 44,904.00 COMPLETED
201 19/0062/01-0/2-2004 2004 TRACTION MOTOR AND ARMATURE ASSY. 395HP US$ 510,276.00 COMPLETED
202 19/0086/01-0/2-2004 2004 REWINDING KIT OF 395HP TRACTION MOTORS US$ 23,877.18 COMPLETED
203 19/0097/01-0/2-2004 2004 ARMATURE ASSY. OF D-29 T/M (20 NOS) US$ 222,100.00 COMPLETED
204 19/0115/01-0/2-2004 2004 MAIN COILS OF HITACHI 395 TRACTION MOTOR US$ 10,230.00 COMPLETED
205 19/0125/01-0/2-2004 2004 CARBON BRUSH OF 761 A19 TRACTION MOTOR US$ 74,370.84 COMPLETED
206 PTCL 1251 2004 UNDERGROUND TELEPHONE CABLES US$ 476,329.84 COMPLETED
207 KF-543-LOT-II 2004 132KV & 66KV CTs UNDER KUWAIT FUND US$ 834,957.00 LEFT BY SUPPLIERS
208 PTCL 1357 2004 UNDERGROUND TELEPHONE CABLES US$ 1,477,000.00 COMPLETED
209 19/0006/01-0/R-05 2005 ARMATURE ASSEMBLY 761 A23 T/M   (16 NOS.) US$ 125,235.04 COMPLETED
210 19/0013/01-0/2-2005 2005 SHAFT WITH PLUG OF 761 A23 T/M (12 NOS.) US$ 6,372.00 COMPLETED
211 19/0029/01-0/2-2005 2005 R/KITS FOR HITACHI 395 HP T/ MOTORS   (22 NOS.) US$ 84,875.56 COMPLETED
212 19/0046/01-0/4-2005 2005 EXCITING FIELD COIL W/POLE PIECE 761 A19 T/M US$ 50,100.00 COMPLETED
213 19/0083/01-0/2-2005 2005 ARMATURE ASSEMBLY- OF 395 HP TOR (30 NOS). US$ 49,458.00 COMPLETED
214 19/0094/01-0/2-2005 2005 F/COIL COMMUTATOR OF 761 A19/A23 T/M (100 NOS) US$ 31,700.00 COMPLETED
215 19/0101/01-0/2-2005 2005 CARBON BRUSH OF 395 HP HITACHI T/M (3600 NOS.) US$ 56,916.00 COMPLETED
216 19/0105/01-0/2-2005 2005 F/COIL COMMUTATOR OF 761 A19/A23 T/M (200 NOS) US$ 62,424.00 COMPLETED
217 19/0014/01-0/2-2006 2006 ARMATURE SHAFT- A23 & 395 HP T/M (12 & 15 NOS.) US$ 17,647.00 COMPLETED
218 PTCL 1398 2006 S.S AERIAL CABLS US$ 1,612,020.84 COMPLETED
219 19/0081/01-0/2-2006 2006 ARMATURE ASSY OF D-29 T/M (34 NOS) US$ 367,434.36 COMPLETED
220 19/0084/01-0/2-2006 2006 COMMUTATOR&C/BRUSHES 395 HP T/M (6&540 Nos) US$ 31,924.00 COMPLETED
221 19/0099/01-0/2-2006 2006 ARMATURE & SHAFT-395 HP T/M (18 & 12 NOS) US$ 244,044.00 COMPLETED
222 LESCO 606 (PO 2110) 2006 DISCONNCTORS US 518,711.20 COMPLETED
223 STG-6-22 (PO 631) 2006 DISCONNECTORS US$ 616,930.00 COMPLETED
224 ADP-66 LOTS IV & VI 2006 132 KV AND 66 KV CTS/Pta US$ 2,208,375.00 COMPLETED
225 19/0104/01-0/1-2006 2006 R/KIT,COIL  AND LEAD ASSEMBY OF D-29 T/M US$ 168,329.04 COMPLETED
226 SIEMENS H-28 2006 Hydaulic Press with all Tools and Accessories Euro 3,416.00 COMPLETED
227 SIEMENS SUNDER 2007 145KV 20KA 200-100/5-5-5A Single Phase CTs US$ 10,140.00 COMPLETED
228 19/0127/01-0/1-2006 2007 COMM.R/KIT-D-29-ARMATURES ETC. OF 395-HP T/M US$ 252,588.44 COMPLETED
229 GEPCO/33 2007 132/11.5 KV, 31.5/40  MVA POWER TRANSFORMERS US$ 1,890,619.00 LEFT BY SUPPLIERS
230 PESCO 20 2007 132/11.5 KV, 31.5/40  MVA POWER TRANSFORMERS US$ 1,833,592.00 LEFT BY SUPPLIERS
231 ADB-07 LOT III & VII 2007 132 KV CTS & PTS EURO 157,740.00 COMPLETED
232 PESCO 36 2008 132 KV CTS & PTS US$ 442,620.00 LEFT BY SUPPLIERS
233 19/0016/01-0/1-2008 2008 CABLE & Bearing Housing Assy and,Perm Putty EURO 58,830.92 COMPLETED
234 19/0033/01-0/1-2008 2008 GLASS TYPE ETC. US$ 6,228.00 COMPLETED
235 ADB-09 LOT IX (A&B) 2008 500 KV, 220 KV AND 312 KV POST INSUTLAORS EURO 193,824.40 COMPLETED
236 19/0047/01-0/1-2008 2008 ARMATURE OF T/MOTORS 761 A19 EURO 169,986.05 COMPLETED
237 19/0055/01-0/1-2008 2008 ARMATURE OF T/MOTORS 761 A23 US$ 421,136.10 COMPLETED
238 19/0126/Spl-4/4-08 2008 Starting Gen: Main Alternator Cable Assy, (DLW) EURO 60,241.56 COMPLETED
239 19/0150/Spl-4/4-08 2008 Auxiliary Generator of Chinese Locos EURO 47,478.88 COMPLETED
240 19/0151/Spl-4/4-08 2008 Main Alternators, Exciter Cable Assy: (DLW) EURO 55,993.89 COMPLETED
241 19/0160/01-0/1-2008 2008 High Friction Brake Shoes US$ 248,172.32 COMPLETED
242 SIEMENS PAKISTAN 2008 132 KV, 20KA, 0.2 Class  CTs ratio 200-1001/5-5 A, 15VA EURO 35,786.10 COMPLETED
243 19/0109/01-0/2-2008 2008 C/B Holder Connectors, Cable Assy, C/ B C/End -Armature Shaft etc. EURO 22,762.50 COMPLETED
244 IESCO PO 54 (TENDER 155) 2009 145 & 66 KV PTS US$ 97,762.00 COMPLETED
245 HESCO PO 02-0023 2009 145 KV CTS/PTS EURO 288,900.00 COMPLETED
246 NTDC GALLOP 2009 145 KV CTS US$ 259,495.65 COMPLETED
247 PESCO/12 2009 145 KV CT and PTS US$ 438,750.00 COMPLETED
248 19/0009/01-0/1-2009 2009 Commutator,395 HP T/Motor- Cable Assy A23 T/M EURO 72,738.60 COMPLETED
249 19/0108/01-0/2-2009 2009 REWINDING KITS FOR HITACHI 395 HP T/MOTOR US$ 126,032.15 COMPLETED
250 19/0099/01-0/2-2009 2009 Spares for Chinese Traction Motor ZD-109 BP US$ 43,612.26 COMPLETED
251 19/0110/01-0/2-2009 2009 ARMATURE ASSEMBLY OF 395HP T/M (30 NOS). US$ 147,504.24 COMPLETED
252 19/0108/01-0/2-2009 2009 Rewinding Kit 395 HP T / Motor Armature US$ 126,032.15 COMPLETED
253 19/0110/01-0/2-2009 2009 Armature Assembly T/Motor 395 HP T/M US$ 11,528,244.00 COMPLETED
254 19/0009/01-0/2-2009 2009 Commutator Assembly 395 HP & A-23 T/M EURO 72,738.60 COMPLETED
255 HESCO-ADB-02 2010 132 KV AND 66 KV CTS & PTS US$ 296,760.00 COMPLETED
256 PESCO-14 2010 132 KV INSULATORS US$ 39,900.00 COMPLETED
257 GEPCO 9-63 2010 132 KV, 40 KA, CTS EURO 58,140.00 COMPLETED
258 PESCO-ADB-02 2010 132 KV, 40 KA, CTS US$ 289,560.00 CIOMPLETED
259 PESCO ADB-08 2010 STATIC  SINGLE & THREE PHASE AND  LT MDI METERS US$ 3,831,187.40 LEFT BY SUPPLIERS
260 TLM-01 2011 SPACER AND VIBERATION DAMPERS EURO 40,270.00 LEFT BY SUPPLIERS
261 ADB-50 LOT IX 2011 500 AND 132 KV INSULATORS US$ 72,050.00 COMPLETED
262 NOR-15A 2011 145 KV BUS AND LINE ISOLATORS US$ 436,950.00 UNDEDR TESTING
263 NOR-16 (LOT-1) 2011 132 KV CTs 1200(IA) (P-205:05) &132 KV PTs (P-206:05) CNY 2,113,440.00 COMPLETED
264 LESCO 58 2011 145 KV PTs Single Phase CNY 644,400.00 COMPLETED
265 19/0085/01-0/2-2011 2011 Armature Assembly 395 HP T/Motor CNY 6,084,549.90 COMPLETED
266 19/0080/01-0/2-2011 2011 ARMATURE R/KITS & COMMUTATOR S OF 395 HP T/M US$ 74,560.46 COMPLETED
267 19/0047/01-0/2-2011 2011 Rewinding Kits- D-29 T/ Motor CNY 912,648.55 COMPLETED
268 19/0034/01-0/2-2011 2011 CABLE ASSEMBLIES- A-23 T/MOTORS US$ 19,003.50 COMPLETED
269 IES-GS-1/MJ/961 (MJ Corp) 2011 132 KV L/ CTs,(P-90), 132 KV T/CTS (P-90), 132 KV PTs (P-129:) CNY 1,225,500.00 COMPLETED
270 19/0087/01-0/2-2012 2012 Rewinding Kits- 761 A23 T/M. CNY 1,172,665.00 COMPLETED
271 19/0095/01-0/2-2012 2012 Armatures, B/Housing (C/E) and Cable Assy. A-23 CNY 5,156,592.00 COMPLETED
272 19/0100/01-0/2-2012 2012 REWINDING KITS D-29 TRACTION MOTOR CNY 1,599,075.00 COMPLETED
273 19/0099/01-0/2-2012 2012 COMMUTATOR ASSY & R/Kits of HITACHI 395 HP CNY 1,705,680.00 COMPLETED
274 19/0098/01-0/2-2012 2012 COMMUTATOR ASSY D-29 CNY 568,560.00 COMPLETED
275 19/0058/01-0/2-2012 2012 CABLE ASSY,I/ BEARING STOPPER C/E, POLY GLASS TAPE 1″ CNY 101,611.56 COMPLETED
276 SSE/PO-DITG/28 2012 132 KV P.Ts with accessories (P-129: 85) CNY 140,100.00 COMPLETED
277 SIEMENS MOMINPURA (LESCO) 2012 145KV, 40KA CTs and PTs US$ 55,785.00 COMPLETED
278 PO 19-0008/01-0/2-2013 2013 FREQUENCY MOTOR & EXCITOR GQC CNY 362,560.00 COMPLETED
279 P.O # 00101 (AL AMIN) 2013 132 KV single phase CTs & PTs US$ 154,320.00 COMPLETED
280 SIEMENS (HESCO 7 &10) 2013 145 KV, 40 KA CTS & 145 KV PTs US$ 190,026.00 COMPLETED
281 SIEMENS (JDW) 2013 145 KV, 40 KA CTS & 145 KV PTs US$ 297,960.00 COMPLETED
282 SIEMENS (NOORPUR-IESCO) 2013 145 KV, 40 KA CTS & 145 KV PTs US$ 20,280.00 COMPLETED
283 SIEMENS RYK 2014 145 KV CTS /PTS US$ 136,620.00 COMPLETED
284 AL-AMIN 2014 145 PTS US$ 19,266.00 COMPLETED
285 SIEMENS (JDW ADDL.) 2014 145 KV, 40 KA CTS & 145 KV PTs US$ 51,204.00 COMPLETED
286 PO 19/0039/01-0/2-2013 2013 POLY GLASS BANDING TAPE 1″ CNY 18,231.00 COMPLETED
287 PO 19/0035/01-0/2-2013 2013 AC AUXILIARY GENERATORS (DLW CHINA) CNY 407,880.00 COMPLETED
288 PO 19/0048/01-0/2-2013 2013 ARMATURES OF EMD D-29 & GE 761 A 23 T/MOTORS CNY 7,024,806.00 COMPLETED
289 PO 19/0004/01-0/2-2014 2014 POLY GLASS BANDING TAPE I” CNY 54,693.00 COMPLETED
290 PO 19/0024/SR-150/3-2014 2014 Armature Assembly D-29 Traction Motor CNY 2,738,358.00 COMPLETED
291 PO-19/0014/01-0/2-2014 2014 Armature Assembly 761 A19 T/M CNY 1,153,600.00 COMPLETED
292 PO-19-0063/SR-150/4-2014 2014 Bearing Housing (C/End) CNY 105,183.60 COMPLETED
Frame Head (P/End)
293 PO-19-0039/01-0/1-2014 2014 Rewinding Kit D-29 T/M CNY 618,000.00 COMPLETED
294 PO-19-0021/01-0/2-2014 2014 Poly Glass Binding Tape 1” CNY 112,500.00 COMPLETED
295 PO-19/0081/SR-150/3-2014 2014 Armature Assembly 395 HP T/M CNY 23,113,200.00 COMPLETED
296 PO-19/0060/01-0-2014 2014 Armature Assembly D-29 Traction Motor CNY 2,827,350.00 COMPLETED
297 PO-19/0102/SR-150/2-2014 2014 Bearing Cover P/E, Inner Bearing Stopper C/E & Teflon Ring CNY 360,706.00 COMPLETED
298 SIEMENS (HAMZA) 2014 132KV, 40KA, 200/1A, 15VA, 1 core single phase Metering CTs/PTs US$ 43,560.00 COMPLETED
299 NOR-29-2013 2014 145KV, single pole, 4-core and 3 Core CTs US$ 88,305.00 COMPLETED
300 19/0043/SR-150/2-2014 2014 Axle Finished Machine to drawing No. DE-1317 US$           36,944.04 COMPLETED
301 19/0012/01-0/4-2014 2014 Axle Finished Machine to drawing No. DE-4695 RGE-24 US$           19,817.20 COMPLETED
302 19/0042/01-0/1-214 2014 Axle AGE-30 to Drawing No. DE-60060 US$           36,412.56 COMPLETED
303 AL-AMIN GEPCO PINGGAO 2014 145 KV, 40KA, 2000 Amps. Three pole Single throw Bus Disconnectors SSS and Parallel Disconnectors CNY 529,600.00 COMPLETED
304 AL-AMIN GEPCO NORIT 2014 145 KV, 40KA Single Phase Current Transformer ratio 1200:600:300/5-5-5-5A including Steel Supporting Structure, G/Bolts and Terminal connectors. USD 126,555.00 COMPLETED
145 KV, 40KA Single Phase Current Transformer ratio 200:100/5-5-5-5A including Steel Supporting Structure, G/Bolts and Terminal connectors.
145 KV, Voltage Transformer ratio 132 KV/3.110.3 PTs Single Phase including Steel Supporting Structure, G/Bolts and Terminal connectors.
305 PO-19/0058/01-0/2-2014 2015 Main, Inter Pole, Shaft 761 A-23, Bearing Housing and Cable Assy CNY 1,677,396.20 COMPLETED
306 PO-19-0002/SR-150/3-2015 2015 D.E Locomotives Cables EURO 116,492.58 COMPLETED
307 19/0027/01/0/3-2015 2015 Poly Glass Binding Tape 1” CNY           69,000.00 COMPLETED
308 19/0042/01-0/4-2015 2015 Sleeve Liner to Lower USD           24,168.54 COMPLETED
Bearing Cam Shaft
309 ADB-IESCO/TR-IV/ICB-01/2014 (LOT-II) 2015 132KV, 40KA 2000 AMPS, 110V DC, 3-Pole Circuit Breakers with extended creepage distance including SSS, foundation bolts and terminal connectors for 600mm horizontal Al: Conductors USD         350,408.00 COMPLETED
145KV, 40KA 2000 AMPS, 3-Pole Single throw Bus Dis Connectors (Parallel Type) with insualtor of extended creepage distance including SSS, foundation bolts and terminal connectors for 600mm horizontal Al: Conductors
ADB-IESCO/TR-IV/ICB-01/2014 (LOT-III) 132 KV Single Phase Surge Arrester substation class having insulator of extended creepage distance with SSS complete with mounting arrangement, foundation bolts and terminal connectors for 600 mm Hawthorn Conductor USD         222,762.00 COMPLETED
11KV Surge Arresters with mounting arrangement
132KV, 40KA, Single Phase Current Transformer ratio 200:100/5/5/5 A (3 Core) (Transformer CTs) with SSS foundation bolts mounting arrangement connectors for 600mm Hawthorn Conductor
310 NOR-36-2014 (LOT-II) 2015 132KV Current Transformers as per specifications P-205:2005, amended to date along grouting bolts, steel supporting structures and all other allied accessories. (Type LCW-145TAW2). USD 232,128.00 COMPLETED
132KV Voltage Transformers as per specifications P-206:2005, amended to date along grouting bolts, steel supporting structures and all other allied accessories. (Type JDCF-145TAW2).
311 19/0031/01-0/2-2015 2015 Armature Assembly 395 HP CNY    15,023,580.00  COMPLETED
312 19/0034/01-0/3-2015 2015 Interpole 395 HP, Lead Assy D-29 & Commutator 395 HP T/M CNY      1,101,482.00  COMPLETED
313 19/0085/01-0/2-2015 2015 Armature 761 A-19 CNY      1,326,640.00  COMPLETED
314 19/0082/01-0/2-2015 2015 Coil Assy Inter Pole D-29, Interpole Coil S-Pole 395 HP, Interpole Coil N-Pole 395 HP & Frame Head 761A-23 CNY 1,145,875.00  COMPLETED
315 NOR-30D-2015 (LOT-II) 2015 132 KV Post Insulators USD 28,395.00  CANCELLED
145 KV Post Insulators Stacks, having bushing with extended creepage distance, IEC type designation C8-650 complete with steel supporting structure, anchor bolts as per IEC 60273 & NTDC Specifications P-19:83 P-139:80, P-82:81, P-182:91 & P-176:2011 (Total height of Post Insulator + Steel supporting structure shall be 4.5m)
145 KV Connectors as per NTDC Specification P-176:2011, BSH, BSHH & BSCCC
316 19/0007/SR-100/1-2015 2015 Bearing, Dip Stick English Language Engraving USD 35,411.40  COMPLETED
317 19/0020/SR-100/3-2016 2016 D.E Locomotives Cables EURO 175,899.98  COMPLETED
318 19/0030/SR-100/1-2016 2016 Poly Glass Binding Tape 1” CNY 18,231.00  UNDER SHIPMENT
319 19/0014/01-0/2-2016 2016 Bearing Housing, Lead Assy”F”, Lead Assy “FF”, Lead Wire “AA”, Lead Wire “A”, Lead Assy “Y” Lead Assy”YY” CNY 444,424.40  COMPLETED
320 19/0066/SR-100/4-2016 2016 Armature 761 A-23 T/M and Armature Assy D-29 CNY 5,909,316.00  PARTIALLY SHIPPED REMAINING BEINGSHIPPED IN FEB/MARCH, 2017
321 CPP-02M-2016 (LOT-III) 2016 OPGW WITH AT LEAST 24 FIBERS QTY: 60 KM USD 91,144.44  COMPLETED
322 CPP-02M-2016 (LOT-V) 2016 DISC INSULATORS 160KN QTY: 200,000 NOS. USD 3,568,000.00  COMPLETED
323 19/0083/SR-100/4-2016 2016 Cable 400mm (sqr) 1800 volts H+S Qty: 770 Euro 30,979.21 COMPLETED
324 19/0102/SR-100/4-2016 2016 Coil Assy No. 1, No.2, No.3, No. 4, Lead Wire “Y”, “YY” & Coil with pole Piece Commutating CNY      1,753,884.00  COMPLETED
325 Siemens (USM & GSM) 2016 145 KV, 40KA, 200/1, Single Core Single Phase Metering CTs USD 8,080.00 COMPLETED
145KV, 40KA, 1600:800:400/1-1-1-1 4 Core Single Phase Line CTs
326 Siemens (HSM-EXT) 2016 132KV, 40KA, 200:100/1A 1 Core Single Phase Metering CTs USD 43,560.00 COMPLETED
132KV, 40KA, 1 Core Single Phase Metering Voltage Transformer
327 RYK 2016 145KV, 40KA, 200:100/1-1-1-1A, 4 Core Single Phase CTs USD 11,055.00 COMPLETED
145KV, 132KV,/3/110/3 2 Core VT
328 19/0099/01-0/2-2016 2016 Coil Assy Main Field No. 1 Bottm CNY 381,584.10 COMPLETED
Coil Assy Main Field No. 2 Suspension
Commutator Seasoned 395 HP T/M
Shaft with Plug (Armature)
Lead Assy: AA
329 CPP-03M-2016 (LOT-III) 2016 OPGW WITH AT LEAST 24 FIBERS QTY: 125 KM USD 174,980.00  COMPLETED
330 LESCO-195/PMU (PO-186) 2017 DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 35 NOS. USD 389,760.00  COMPLETED
331 WPP-10-2016 (LOT-III) 2017 AAAC GREELEY CONDUCTORS QTY: 1684 KM USD 4,707,925.12 CANCELLED
332 NOR-49R-2017 2017 Lead Acid Battery Bank, 48V 100AH, 200AH,300AH,500AH,550AH,560AH,600AH,700AH,750AH,1000AH, and 1250 AH  (Plante Type) Qty: 31 Nos. USD 392,106.00  COMPLETED
333 LESCO-255/PMU (PO-242) 2017 DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 25 NOS. USD 314,025.00  COMPLETED
334 ADB-TRANCHE-IV-IESCO-01(S)-2017 ICB-01(S) 2017 FOR PROCUREMENT OF BATTERY BANKS 110 VOLTS 150AH, 55 CELLS QTY: 4 NOS. AND BATTERY CHARGER 110 VOLTS 150AH, 55 CELLS QTY: 4 NOS. USD 63,600.00  COMPLETED
335 NOR-55-2017 (LOT-II) 2017 For Supply of 145KV Metering Currect Transformers Ratio: 1200-600/1A Qty: 45 Nos. & Marshalling Box CTS Qty: 15 Nos. USD 130,155.00  COMPLETED
336 CHINT/ADB-67-48VDC-Battery 2017 FIAMM 48 Volt Battery Qty: 1 No. USD 19,800.00  COMPLETED
337 MARI PETROLEUM ORDER NO. 1010037977 2018 FOR SUPPLY OF DRY BATTERIES (METERING UPS BATTERIES REPLACEMENT) QTY: 40 PCS USD 7,972.80  COMPLETED
338 CPP-04M(R)-2017 (LOT-III) PACKAGE-1 2018 OPGW ALONG WITH AT LEAST 24 FIBERS QTY: 266 KM CNY 3,056,579.60  COMPLETED
339 NETRACON 2018 Lead Acid Battery Bank, 48V, 24 Cells x SGL-15D Plante Type Dry Charged Qty: 01 No. USD 5,680.00  COMPLETED
340 NETRACON 2018 Lead Acid Battery Bank, 48V, 24 Cells x SGL-15D Plante Type Dry Charged Qty: 02 Nos. USD 11,360.00  COMPLETED
341 F-02-BEC-0152-18 (BRITLITE ENGINEERING) 2019 VRLA Battery Model: 12SP72 Voltage: 12 VDC, 70AH Qty: 128 PCS USD 14,720.00  COMPLETED
342 LESCO-339/PMU (PO-306) 2019 DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 25 NOS. EURO 263,775.00  COMPLETED
343 TLM-06M-2018 2019 OPGW WITH AT LEAST 24 FIBERS QTY: 70 KM CNY 807,406.95  COMPLETED
344 PO-027-8 dated 22.10.2019 (Jaffer Brother) 2019 OPGW Qty: 14 KM USD 22,600.00  COMPLETED
345 PO-027-8 dated 22.10.2019 (Jaffer Brother) 2019 OPGW Qty: 10 KM USD 16,006.00  COMPLETED
346 TLM-08M-2019 2020 OPGW ALONGWITH AT LEAST 24 FIBERS QTY: 53 KM USD 91,227.00 UNDER PROCESS