(UPDATE TILL 14.12.2020)
|
SR.#
|
CONTRACT #
|
YEAR
|
DESCRIPTION
|
CURRENCY
|
CFR AMOUNT
|
STATUS
|
1 |
2664/1419/DPE/US AID |
1967 |
TEST INSTRUMENTS |
US$ |
40,780.00 |
COMPLETED |
2 |
2683/1374/A/DPE/US AID |
1968 |
UNDERGROUND CABLES 15KV |
US$ |
407,000.00 |
COMPLETED |
3 |
2695/1432/DPE/US AID |
1968 |
CLAMPS, DEADEND 11 KV |
US$ |
11,087.00 |
COMPLETED |
4 |
2727/DPE |
1968 |
GENERATING SETS |
RS. |
350,000.00 |
COMPLETED |
5 |
2731/DPE |
1968 |
H.T. COMPOUND |
US$ |
6,041.00 |
COMPLETED |
6 |
2764/DPE |
1968 |
LOAD BREAK FUSE 15 KV |
US$ |
22,222.00 |
COMPLETED |
7 |
2767/DPE |
1968 |
FUSE CUTOUTS 15KV |
US$ |
580,801.00 |
COMPLETED |
8 |
2782/DPE |
1968 |
CONDUCTOR HARDWARE 132KV & 220 KV |
US$ |
62,201.00 |
COMPLETED |
9 |
2836/DPE |
1969 |
MOBILE GENERATING SETS |
US$ |
10,830.00 |
COMPLETED |
10 |
2850/DPE |
1969 |
LINE TOOLS AND EQUIPMENT |
US$ |
16,289.00 |
COMPLETED |
11 |
2859/DPE |
1969 |
CABLE TEST EQUIPMENT |
US$ |
20,525.00 |
COMPLETED |
12 |
2900/DPE |
1969 |
REPRODUCTION EQUIPMENT |
US$ |
8,720.00 |
COMPLETED |
13 |
2905/DPE |
1969 |
TEST METERS |
US$ |
11,194.00 |
COMPLETED |
14 |
2909/DPE |
1969 |
SPARE PARTS (GE USA) |
US$ |
10,085.00 |
COMPLETED |
15 |
2915/DPE |
1969 |
LINE TOOLS |
US$ |
89,720.00 |
COMPLETED |
16 |
SCARP/US AID |
1970 |
X’ARMS, BORED (WOODEN) 11& 32KV |
US$ |
97,695.00 |
COMPLETED |
17 |
2909/DPE |
1970 |
PHOTO CONTROL UNITS |
US$ |
10,085.00 |
COMPLETED |
18 |
TLM/108 (CE GSC) |
1970 |
CONDUCTOR GROUND WIRE |
US$ |
116,382.00 |
COMPLETED |
19 |
TLM/112 (CE GSC) |
1970 |
ELECTRICAL EQUIPMENT |
US$ |
22,603.00 |
COMPLETED |
20 |
3028/DPE/USAID |
1971 |
PHOTO CONTROL UNITS |
US$ |
7,910.00 |
COMPLETED |
21 |
RTL/PO-7 |
1971 |
VOLTMETERS |
US$ |
735 |
COMPLETED |
22 |
2911/DPE/USAID |
1971 |
PHOTO CONTROL UNITS |
US$ |
10,000.00 |
COMPLETED |
23 |
IDA-01 LOT II |
1972 |
132/11KV, 20/26MVA,(14) P/TRANSFORMERS (TURNKEY) |
US$ |
1,400,000.00 |
COMPLETED |
24 |
IDA-02 LOT III |
1972 |
132/66/11KV,(12) 132KV S/STATIONS (TURNKEY) |
US$ |
2,000,000.00 |
COMPLETED |
25 |
IDA-05 LOT I |
1972 |
132/11KV, 10/13 MVA, (6) P/ TRANSFORMERS (TURNKEY) |
US$ |
580,000.00 |
COMPLETED |
26 |
PR/TR/11 |
1972 |
B.G. HARD WOOD SLEEPERS 11KV & 32KV |
SING. $ |
2,553,090.00 |
COMPLETED |
27 |
SW-1267 |
1973 |
FERTILIZER (UREA) |
US$ |
392,222.00 |
COMPLETED |
28 |
IDA-06 LOT II |
1973 |
132/66/11KV (9) S/STATIONS (TURNKEY) |
US$ |
1,429,209.00 |
COMPLETED |
29 |
SW-1293 |
1973 |
FERTILIZER (DAP) |
C$ |
1,172,980.00 |
COMPLETED |
30 |
SW-1296 |
1973 |
FERTILIZER (UREA) |
US$ |
811,762.00 |
COMPLETED |
31 |
PD/PCPP |
1974 |
600 TONS P.C. WIRE |
US$ |
327,000.00 |
COMPLETED |
32 |
ASO 1284 |
1974 |
FERTILIZER |
US$ |
570,000.00 |
COMPLETED |
33 |
FDAS-1444/3 |
1975 |
FERTILIZER (NP:23:23) |
US$ |
1,782,000.00 |
COMPLETED |
34 |
IBS (INDUS BASIN SURVEY) |
1975 |
AERIAL PHOTOGRAPHY(80,000 SQR.MILES) |
US$ |
1,000,000.00 |
COMPLETED |
35 |
PR-11/74-TR/2 |
1975 |
7101 NOS SPECIAL TIMBER FOR RAILWAYS CROSSINGS |
S.$ |
420,686.00 |
COMPLETED |
36 |
10552-67/1 |
1976 |
OIL DEHYDRATION PLANTS (TPS LYALLPUR) |
JY |
7,786,909.00 |
COMPLETED |
37 |
10553-51 |
1976 |
OIL DEHYDRATION PLANTS (TPS QUETTA) |
JY |
7,786,909.00 |
COMPLETED |
38 |
773/CET(1976) |
1976 |
STORAGE BATTERIES FOR P/STATION 132 & 110V, 55AH |
US$ |
54,651.00 |
COMPLETED |
39 |
FDAS-1553/8 |
1976 |
FERTILIZER (NP:23:23) |
US$ |
6,721,312.00 |
COMPLETED |
40 |
FDAS-1553/9 |
1976 |
FERTILIZER (NP:23:23) |
US$ |
3,734,062.00 |
COMPLETED |
41 |
FDAS-1644/6 |
1976 |
FERTILIZER (NP:23:23) |
US$ |
1,158,675.00 |
COMPLETED |
42 |
193/CEGSO/P&S |
1977 |
SPARE PARTS FOR CIRCUIT BREAKERS |
US$ |
155,930.00 |
COMPLETED |
43 |
3468/DPE |
1977 |
T/l HAREWARE 132KV & 220KV |
FFR |
283,372.35 |
COMPLETED |
44 |
913/CEGSO |
1977 |
SPARES FOR SUBSTATION |
US$ |
192,099.00 |
COMPLETED |
45 |
917/CET |
1977 |
DEHYDRATION PLANTS |
SFR |
52,771.38 |
COMPLETED |
46 |
PD/GSC-213/PAK |
1978 |
SPARES PARTS FOR SUBSTATION |
US$ |
5,526.86 |
COMPLETED |
47 |
PR-II/77-TR/11 |
1978 |
B.G. HARDWOOD SLEEPERS |
S.$ |
2,533,490.00 |
COMPLETED |
48 |
1933-5/TR-8 |
1979 |
FORK LIFTERS FOR SUBSTATION |
JY |
2,854,000.00 |
COMPLETED |
49 |
276/CEGSO |
1979 |
SPARE PARTS FOR SUBSTATION |
US$ |
18,052.00 |
COMPLETED |
50 |
290/CEGSO |
1980 |
SPARES PART FOR SUBSTATION |
US$ |
192,099.93 |
COMPLETED |
51 |
295/CEGSO |
1980 |
SPARE PARTS FOR SUBSTATION |
US$ |
9,860.00 |
COMPLETED |
52 |
500KV BOOSTING (MITSUBISHI) |
1980 |
SUB STATION EQUIPMENT, 500 KV |
US$ |
10,000,000.00 |
COMPLETED |
53 |
307 LOT-I |
1980 |
STATION BATTERIES 132KV & 110V, 55AH |
DM |
717,974.00 |
COMPLETED |
54 |
1389-A/CET |
1981 |
ALUMINIUM BRASS TUBES |
JY |
1,600,000.00 |
COMPLETED |
55 |
3816/CES |
1981 |
SHORT CIRCUTTING AND GROUNDING SETS |
FFR |
1,752,480.00 |
COMPLETED |
56 |
312 LOT-II |
1981 |
FORK LIFTERS |
JY |
27,249,149.00 |
COMPLETED |
57 |
3852/CES |
1981 |
200,000 NOS. S/PHASE ENERGY METERS |
JY |
233,500,000.00 |
COMPLETED |
58 |
3866/DGM |
1981 |
LEATHER SAFTY BELTS FOR LINE MEN |
FFr |
1,170,000.00 |
COMPLETED |
59 |
501 LOT I & II |
1981 |
STATION CONNECTORS 132KV & 220KV |
FFr |
3,444,006.00 |
COMPLETED |
60 |
1880/GMT |
1982 |
ALUMINIUM BRASS TUBES |
JY |
53,222,400.00 |
COMPLETED |
61 |
318 LOT-I |
1982 |
STATION BATTERIES 132KV & 220KV, (110V, 55AH) |
US$ |
173,103.51 |
COMPLETED |
62 |
307 LOT-I |
1982 |
STATION BATTERIES (ADD.)132KV,110V, 55 AH |
US$ |
91,248.00 |
COMPLETED |
63 |
9730-45/EXN/TR |
1982 |
INSULATING MATERIAL |
US$ |
41,200.00 |
COMPLETED |
64 |
3922/CES |
1982 |
33 KV FUSE CUTOUTS |
J.Y |
25,477,275.00 |
COMPLETED |
65 |
391/0473 |
1983 |
COEFFING HOISTS ETC |
US$ |
151,812.00 |
COMPLETED |
66 |
4007/CES/DPE/2213 |
1983 |
DEAD AND CLAMPS. 11 KV |
FFr |
379,665.00 |
COMPLETED |
67 |
4070/DGM |
1983 |
LEATHER SAFTY BELTS FOR LINE MEN |
FFr |
2,171,360.00 |
COMPLETED |
68 |
428/ESR |
1983 |
WOODEN CROSSARMS, 11KV & 33KV |
S.$ |
352,184.00 |
COMPLETED |
69 |
438-42/GM(O) |
1983 |
RESISTANCE TESTERS |
US$ |
38,315.00 |
COMPLETED |
70 |
561 LOT-VIII |
1983 |
WOODEN CROSSARMS |
S.$ |
945,368.05 |
COMPLETED |
71 |
561/1(1-2) |
1983 |
11 KV, INSULATED B/ CONDUCTOR & ACCERS. |
FFr |
3,488,760.00 |
COMPLETED |
72 |
5617/CEGSO/T-59 |
1983 |
STATION BATTERIES 132KV & 220KV (110V & 220V) |
JY |
52,367,130.00 |
COMPLETED |
73 |
4048/CES |
1983 |
THREE PHASE ENERGY METERS |
J.Y |
130,000,000.00 |
COMPLETED |
74 |
2383/DPE |
1983 |
33KV DROPOUT CUTOUTS |
J.Y |
11,749,280.00 |
COMPLETED |
75 |
2300/DGM |
1984 |
33KV FUSE CUTOUTS |
JY |
19,262,720.00 |
COMPLETED |
76 |
3979/CES |
1984 |
TERMINATION KITS, 11KV |
US$ |
54,544.02 |
COMPLETED |
77 |
504 LOT-lll (A) |
1984 |
SUBSTATION CONNECTORS , 132KV & 220 KV |
FFr |
528,026.04 |
COMPLETED |
78 |
504/IBRDL-lll |
1984 |
HARDWARE FOR 132KV SUB-STATIONS |
FFr |
571,404.82 |
COMPLETED |
79 |
GMT/CPP/DUKI |
1984 |
COAL EXPLORATION HOLES DRILLING |
US$ |
2,000,000.00 |
COMPLETED |
80 |
4224/DGM |
1985 |
11KV DEADEND CLAMPS |
US$ |
129,060.00 |
COMPLETED |
81 |
4278/DGM |
1985 |
11KV LIGHTING ARRESTORS |
US$ |
33,000.00 |
COMPLETED |
82 |
561/1 (ADDITIONAL) |
1985 |
WOODEN CROSSARMS, 11KV & 33KV |
S.$ |
243,147.60 |
COMPLETED |
83 |
C-89/STG |
1985 |
STATION CONNECTORS , 132KV & 220KV |
FFr |
571,904.82 |
COMPLETED |
84 |
391-K-189/USAID |
1986 |
Bl-NOCULARS |
US$ |
2,112.00 |
COMPLETED |
85 |
824-87-04 |
1986 |
COMPRESSION CONNECTORS, 11KV |
FFr |
153,830.00 |
COMPLETED |
86 |
401-LOT-V |
1987 |
ISOLATORS, 132KV |
US$ |
919,909.00 |
COMPLETED |
87 |
406 LOT II & III |
1987 |
STATION HARDWARE & CONNECTOR 132KV&220KV |
FFr |
2,240,816.72 |
COMPLETED |
88 |
406 LOTS II & III (ADDL) |
1987 |
S/ CONNECTORS & HAREWARE 132KV & 220KV |
FFr |
313,888.84 |
COMPLETED |
89 |
734/1 LOT-7 |
1987 |
COMPRESSION TOOLS |
FFr |
75,250.00 |
COMPLETED |
90 |
7965/114/EGP-I |
1987 |
DISTRIBUTION TRANSFORMERS |
US$ |
303,877.00 |
COMPLETED |
91 |
ICC/BIN QASIM (KESC) |
1987 |
T/L S/STEEL HARDWARE AND DAMPER, 220KV |
FFr |
4,589,220.32 |
COMPLETED |
92 |
230/CE/STG |
1988 |
SPARE PARTS |
US$ |
76,561.60 |
COMPLETED |
93 |
2309/GMT |
1988 |
125MVA STEPUP TRANSFORMER, 220KV |
US$ |
558,840.00 |
COMPLETED |
94 |
2698/03 LOT-I |
1988 |
T/L HARDWARE 132 KV & 220 KV |
FFr |
732,610.30 |
COMPLETED |
95 |
391/0486/USAIA |
1988 |
TTR, RELAYS ETC |
US$ |
38,315.00 |
COMPLETED |
96 |
391/0486/USAID |
1988 |
TESTING EQUIPMENT |
US$ |
91,886.00 |
COMPLETED |
97 |
413 LOT-I |
1988 |
132KV CIRCUIT BREAKERS |
US$ |
1,150,000.00 |
COMPLETED |
98 |
413 LOT-III,CTS, PTS |
1988 |
CTs & PTs & ISOs 132 KV |
US$ |
1,569,249.64 |
COMPLETED |
99 |
416 LOTS I,II & III |
1988 |
132KV STEEL TOWERS |
US$ |
6,486,448.21 |
COMPLETED |
100 |
417 LOT-III |
1988 |
S/ CONNECTORS AND HAREWARE 132KV & 220KV |
FFr |
856,627.00 |
COMPLETED |
101 |
423 LOT-II |
1988 |
11KV STREET STEEL POLES |
FFr |
4,661,763.00 |
COMPLETED |
102 |
425 LOT I & II |
1988 |
132KV STEEL POLES |
K.Won |
2,387,717.80 |
COMPLETED |
103 |
566-12 |
1988 |
CONDUCTOR ACCESSORIES, 500KV |
FFr |
1,029,027.35 |
COMPLETED |
104 |
614 LOT-I |
1988 |
ENAMALLED COPPER WIRE |
US$ |
267,075.70 |
COMPLETED |
105 |
948-50/CE THERMAL |
1988 |
ERW STEEL PIPE |
JY |
42,160,580.00 |
COMPLETED |
106 |
421 LOT-II |
1989 |
CURRENT AND POTENTIAL TRANSFORMERS 132KV |
US$ |
481,771.40 |
COMPLETED |
107 |
421 LOT-III |
1989 |
CURRENT TRANSFORMER 132KV |
US$ |
507,636.00 |
COMPLETED |
108 |
424 LOT-II |
1989 |
AUTO TRANSFORMERS, 220 KV, 160 MVA |
K.Won |
############# |
COMPLETED |
109 |
505/PAK/(SF)/12 |
1989 |
T/L HAREWARE 132KV & 220KV |
FFr |
667,426.00 |
COMPLETED |
110 |
GSQ/ l |
1989 |
STEEL TOWERS STUBS , 220KV |
J.Y |
55,010,295.75 |
COMPLETED |
111 |
1389/C&T/T-117 |
1990 |
ALUMINIUM BRASS TUBES |
JY |
51,600,000.00 |
COMPLETED |
112 |
824-108 LOT-ll |
1990 |
132KV CURRENT TRANSFORMERS |
US$ |
258,444.00 |
COMPLETED |
113 |
824-108 LOT-lll |
1990 |
132 & 66KV ISOLATORS |
US$ |
1,014,807.00 |
COMPLETED |
114 |
824-109 |
1990 |
220 KV S/STATION CONNECTORS |
RS. |
31,003,661.00 |
COMPLETED |
115 |
903 LOT-l |
1990 |
500KV STEEL TOWERS |
US$ |
1,795,076.76 |
COMPLETED |
116 |
904 LOT-ll |
1990 |
SHEILDWIRE |
J.Y |
26,611,875.00 |
COMPLETED |
117 |
GSQ-3 |
1990 |
220 KV SUBSTATION EQUIPMENT |
J.Y |
55,458,740.00 |
COMPLETED |
118 |
1073-3 PACKAGE-lll |
1991 |
CONDUCTOR ACCESSORIES FOR 500KV T/L |
FFr |
2,077,255.90 |
COMPLETED |
119 |
1073-6 PACKG-ll |
1991 |
500KV T/L HARDWARE |
FFr |
6,338,441.48 |
COMPLETED |
120 |
1150-12 ITEM-2 |
1991 |
500KV/T/L HARDWARE |
FFr |
4,869,452.80 |
COMPLETED |
121 |
4701/DGM(P)/DPE |
1991 |
TRANSFORMER OIL TREATMENT PLANTS |
J.Y |
40,050,000.00 |
COMPLETED |
122 |
824-112 LOT 1 |
1991 |
BATTERY CHARGERS |
US$ |
111,175.63 |
COMPLETED |
123 |
903 LOT-ll |
1991 |
220KV STEEL TOWERS |
US$ |
885,146.54 |
COMPLETED |
124 |
909 LOT-lll |
1991 |
STRING ASSEMBLIES , 132KV & 220KV |
FFr |
150,390.00 |
COMPLETED |
125 |
910 LOT VI |
1991 |
DEADEND & PG CLAMPS, 11KV |
FFr |
84,300.00 |
COMPLETED |
126 |
910 LOT-ll |
1991 |
WOODEN CROSSARMS, 11KV & 33KV |
Sing.$ |
102,624.00 |
COMPLETED |
127 |
ADB-ll-01 LOT-IV |
1991 |
132KV STEEL POLES |
US$ |
2,508,020.00 |
COMPLETED |
128 |
1073-2 |
1992 |
500KV STEEL TOWERS |
US$ |
8,084,027.00 |
COMPLETED |
129 |
1154-3 LOT-12 |
1992 |
WOODEN CROSSARMS, 11KV & 33KV |
Sing.$ |
1,709,520.00 |
COMPLETED |
130 |
1154-3 LOT-l |
1992 |
WOODEN CROSSARMS |
Sing.$ |
1,058,408.00 |
COMPLETED |
131 |
ADB-ll-03 LOT-IV |
1992 |
ISOLATORS, 132KV & 66KV |
US$ |
459,356.92 |
COMPLETED |
132 |
ADB-ll-04 LOT-IV |
1992 |
STOCK BRIDGE DAMPERS, 132KV & 220KV |
FFr |
222,000.00 |
COMPLETED |
133 |
SSREP/001 |
1992 |
CRAWLER CRANES |
US$ |
260,000.00 |
COMPLETED |
134 |
SSREP/002 |
1992 |
MOTOR GRADERS |
US$ |
96,040.00 |
COMPLETED |
135 |
326/STG |
1993 |
LCM-CPl UNITS |
N.O.K |
1,004,955.00 |
COMPLETED |
136 |
328/STG |
1993 |
KATO (DEHYDERATION PLANTS) SPARES |
J.Y |
20,365,000.00 |
COMPLETED |
137 |
506/CEGSO |
1993 |
S/BATTERSIES, 132KV&220KV (110V&220V&55&110AH |
I.LIRA |
8,598,000.00 |
COMPLETED |
138 |
ADB-ll-05 |
1993 |
STRING ASSEMBLIES & S/CONNECTORS,132 & 220KV |
FFr |
3,769,985.70 |
COMPLETED |
139 |
ADB-ll-05 LOT-VI |
1993 |
CONTROL CABLES |
US$ |
117,676.40 |
COMPLETED |
140 |
ADB-ll-07 LOT-V |
1993 |
S/BATTERIES,132KV&220KV (110V&220V&55&110AH |
I. LIRA |
191,408,700.00 |
COMPLETED |
141 |
PR-1/91-TM(Sch.3) |
1993 |
REEHABILITATION OF G.E 416 NOS.T/MOTORS |
US$ |
6,175,609.64 |
COMPLETED |
142 |
E50 WB2 |
1994 |
DEADING CLAMPS ETC, 11KV |
FFr |
112,150.00 |
COMPLETED |
143 |
1030/S.MODERN (PTCL) |
1995 |
TELECOMMUNICATION CABLES |
US$ |
10,401,523.42 |
COMPLETED |
144 |
504/IBRD (LOT-l & ll) |
1995 |
S/HARDWIRE AND EARTHING MATERIAL132&220KV |
FFr |
1,625,194.50 |
COMPLETED |
145 |
505/IBRD L-ll,lll & IV |
1995 |
132KV GRID STATION EQUIPMENTS |
US$. |
1,051,910.70 |
COMPLETED |
146 |
513/IBRD LOT III |
1995 |
220KV & 132 KV GROUNDING HARDWARE |
FFR |
1,264,375.40 |
COMPLETED |
147 |
ADB-11-21LOT II |
1995 |
GRIDSTATION HARDWARE, 132KV |
FFr |
583,677.00 |
COMPLETED |
148 |
FID-PROC-2-80/5 |
1995 |
N.P.K. 10:20:20 Fertilizer |
US$ |
14,948,325.00 |
COMPLETED |
149 |
1150-22 |
1996 |
T/L HARDWARE 500KV |
FFr |
13,490,298.00 |
COMPLETED |
150 |
19/0155/00-0/1-96 |
1996 |
REHABILITATION OF TWO T/ MOTOR |
US$ |
FREE OF CHARGE |
COMPLETED |
151 |
19/0213/04-0/1-91 |
1996 |
COMMUTATORS OF TRACTION MOTORS |
US$ |
83,300.00 |
COMPLETED |
152 |
19/0312/02-0/1-91 |
1996 |
COMMUTATOR OF TRACTION MOTORS |
US$ |
43,560.00 |
COMPLETED |
153 |
19/0591/01-0/1-89 |
1996 |
ARMATURE W/ COMMUTATOR & SHAFT KIT-OF T/M |
US$ |
243,000.00 |
COMPLETED |
154 |
519/IBRD LOT III & IV |
1996 |
132KV AND 66KV ISOLATORS |
US$ |
212,616.00 |
COMPLETED |
155 |
19/0001/00-0/1-96 |
1997 |
COMPLETE KIT P/END. OF TRACTION MOTORS |
US$ |
10,872.00 |
COMPLETED |
156 |
19/0023/06-0/1-93 |
1997 |
REWINDING KITS. OF TRACTION MOTORS |
US$ |
340,000.00 |
COMPLETED |
157 |
19/0102/00-0/1-95 |
1997 |
COMMUTATOR, CAP. INNER BEARING COIL. OF T/M |
US$ |
74,600.00 |
COMPLETED |
158 |
19/0165/00-0/1-95 |
1997 |
CARBON BRUSH HOLDER FOR T/MOTORS |
US$ |
42,880.00 |
COMPLETED |
159 |
19/0190/01-0/1-95 |
1997 |
MAIN POLE WITH CORE, FOR T/MOTORS |
US$ |
154,188.00 |
COMPLETED |
160 |
19/0190/02-0/1-95 |
1997 |
COMMUTATION POLE WITH CORE.FOR T/M |
US$ |
50,999.36 |
COMPLETED |
161 |
19/0457/02-0/1-91 |
1997 |
ARMATURE ASSEMBLY, FOR T/ MOTORS |
US$ |
81,360.00 |
COMPLETED |
162 |
535/KF LOT IV |
1997 |
ALUMOWELD EARTHWIRE |
US$ |
279,000.00 |
COMPLETED |
163 |
19/0002/00-0/1-98(FBU) |
1998 |
REHABILITATION OF TRACTION MOTORS (8 Nos.) |
US$ |
FREE OF CHARGE |
COMPLETED |
164 |
19/0030/01-0/1-97 |
1998 |
F/COIL, CAP BEARING, ARMATURE SHAFT T/M |
US$ |
123,937.00 |
COMPLETED |
165 |
19/0190/03-0/1-95 |
1998 |
Poly Glass Tape Binding |
US$ |
800.00 |
COMPLETED |
166 |
19/0044/01-0/1-99(PBU) |
1999 |
R/KIT.COILS & COMMUTATOR ASSEMBLY. |
US$ |
181,740.00 |
COMPLETED |
167 |
19/0046/01-0/1-99 (PBU) |
1999 |
REWINDING KIT AND ARMATURE COIL OF T/M |
US$ |
52,185.00 |
COMPLETED |
168 |
2017-3 (ITEM 3) |
1999 |
500 KV CONDUCTOR ACCESSORIES (G/ BORATHA) |
FFr |
1,008,286.00 |
COMPLETED |
169 |
438/CE/STG/DP-l/3751-63 |
1999 |
CURRENT PROBES. FOR LCM |
N.KR |
15,900.00 |
COMPLETED |
170 |
19/0022/01-0/2-2000( R ) |
2000 |
ARAMATURE ASSEMBLY. FOR T/MOTORS |
US$ |
78,360.00 |
COMPLETED |
171 |
19/0110/01-0/2-2000-K |
2001 |
COILS OF D-77 T/M |
US$ |
4,064.00 |
COMPLETED |
172 |
528/IBRD(LOT IV) |
2000 |
ALUMOWELD EARTHWIRE |
US$ |
110,000.00 |
COMPLETED |
173 |
3580/GMT/P&S/GUDDU |
2001 |
11KV, S/ ARRESTORS & COUNTERS FOR G/STATIONS |
US$ |
7,086.00 |
COMPLETED |
174 |
19/0033/01-0/2-2001( R ) |
2001 |
ARMATURE IN & OUTER BEARING STEPPER. FOR T/M |
US$ |
92,161.70 |
COMPLETED |
175 |
19/0039/01-0/2-2001( R ) |
2001 |
COMMUTATOR ASSEMBLY COIL W/POLE. FOR T/M. |
US$ |
40,462.00 |
COMPLETED |
176 |
19/0056/01-0/2-2001( R ) |
2001 |
CONNECTION STRAPS BEARING ETC- T/M A19/A23 |
US$ |
14,124.00 |
COMPLETED |
177 |
19/0062/01-0/2-2001( R ) |
2001 |
SHAFT UNIT PLUG. FOR TRACTION MOTORS |
US$ |
6,054.78 |
COMPLETED |
178 |
19/0004/01-0/2-2002-R |
2002 |
COMMUTATOR ASSEMBLY FOR TIG WELIDER D-29 T/M |
US$ |
17,034.00 |
COMPLETED |
179 |
EM/15/DS-01 |
2001 |
WATER METERES |
US$ |
360,644.91 |
COMPLETED |
180 |
05/0008/01-0/1-2002 |
2002 |
R/KITS & ARMATURE ASSEMBLY FOR T/MOTORS. |
US$ |
244,726.32 |
COMPLETED |
181 |
19/0043/01-0/2-2002( R ) |
2002 |
COIL POLE CABLE ASSEMBLY W/BUSHING FOR T/M |
US$ |
51,367.64 |
COMPLETED |
182 |
19/0050/01-0/2-2002(R ) |
2002 |
ARMATURE AND COMMUTATING FUIL COIL.FOR T/M |
US$ |
154,362.56 |
COMPLETED |
183 |
19/0057/01-0/2-2002-R |
2002 |
ARMATURE ASSEMBLY FOR 395 HP HITACHI T/M |
US$ |
76,225.45 |
COMPLETED |
184 |
19/0063/01-0/2-2002( R ) |
2002 |
SET OF ARMATURE REWINDING KIT. FOR T/MOTORS |
US$ |
280,896.00 |
COMPLETED |
185 |
19/0070/01-0/2-2002( R ) |
2002 |
ARMATURE ASSEMBLY FOR T/MOTORS |
US$ |
65,023.38 |
COMPLETED |
186 |
19/0074/01-0/2-2002(R ) |
2002 |
COIL WITH POLE PIECE EXCITING FOR T/MOTORS |
US$ |
22,260.96 |
COMPLETED |
187 |
19/0088/01-0/2-2003(R ) |
2002 |
ARMATURE AND ARMATURE SHAFT T/ MOTORS |
US$ |
135,430.80 |
COMPLETED |
188 |
19/0090/01-0/2-2002( R) |
2002 |
ARMATURE REWINDING KIT. FOR T/MOTORS |
US$ |
330,219.60 |
COMPLETED |
189 |
19/0100/01-0/2-2002(K) |
2002 |
ARAMATURE ASSEMBLY. FOR TRACTION MOTORS |
US$ |
107,460.00 |
COMPLETED |
190 |
19/0025/01-0/2-2003 |
2003 |
ARMATURE ASSEMBLY FOR TRACTION MOTOR |
US$ |
139,942.40 |
COMPLETED |
191 |
19/0019/01-0/2-2003 |
2003 |
ARAMATURE ASEMBLY FOR 395 HP T/M |
US$ |
136,296.00 |
COMPLETED |
192 |
19/0089/01-0/2-2003 |
2003 |
ARMATURE SHAFT |
US$ |
27,570.00 |
COMPLETED |
193 |
19/0119/01-0/2-2003 |
2003 |
COMMUTATORS FOR GE 761 TRACTION MOTORS |
US$ |
336,800.00 |
COMPLETED |
194 |
19/0097/01-0/2-2003 |
2003 |
COMMUTATORS ASSEMBLY OF HITACHI 395 HP T/M |
US$ |
25,254.00 |
COMPLETED |
195 |
19/0010/01-0/2-2004 |
2004 |
COMMUTATORS OF D-29 TRACTION MOTORS |
US$ |
16,434.00 |
COMPLETED |
196 |
05/0002/01-0/1-2004 |
2004 |
SPARE PARTS OF COILS OF EE55 T/M |
US$ |
290,035.00 |
COMPLETED |
197 |
19/0033/01-0/2-2004 |
2004 |
CABLE ASSEMBLY OF 761 A23 T/MOTORS |
US$ |
7,636.00 |
COMPLETED |
198 |
19/0039/01-0/2-2004 |
2004 |
ARMATURE ASSEMBLY OF 761 A23 T/M |
US$ |
453,977.02 |
COMPLETED |
199 |
19/0053/01-0/2-2004 |
2004 |
ARMATURE ASSEMBLY GE761 A23 T/MOTOR |
US$ |
86,666.28 |
COMPLETED |
200 |
19/0056/01-0/2-2004 |
2004 |
REWINDING KIT OF D-29 TRACTION MOTORS |
US$ |
44,904.00 |
COMPLETED |
201 |
19/0062/01-0/2-2004 |
2004 |
TRACTION MOTOR AND ARMATURE ASSY. 395HP |
US$ |
510,276.00 |
COMPLETED |
202 |
19/0086/01-0/2-2004 |
2004 |
REWINDING KIT OF 395HP TRACTION MOTORS |
US$ |
23,877.18 |
COMPLETED |
203 |
19/0097/01-0/2-2004 |
2004 |
ARMATURE ASSY. OF D-29 T/M (20 NOS) |
US$ |
222,100.00 |
COMPLETED |
204 |
19/0115/01-0/2-2004 |
2004 |
MAIN COILS OF HITACHI 395 TRACTION MOTOR |
US$ |
10,230.00 |
COMPLETED |
205 |
19/0125/01-0/2-2004 |
2004 |
CARBON BRUSH OF 761 A19 TRACTION MOTOR |
US$ |
74,370.84 |
COMPLETED |
206 |
PTCL 1251 |
2004 |
UNDERGROUND TELEPHONE CABLES |
US$ |
476,329.84 |
COMPLETED |
207 |
KF-543-LOT-II |
2004 |
132KV & 66KV CTs UNDER KUWAIT FUND |
US$ |
834,957.00 |
LEFT BY SUPPLIERS |
208 |
PTCL 1357 |
2004 |
UNDERGROUND TELEPHONE CABLES |
US$ |
1,477,000.00 |
COMPLETED |
209 |
19/0006/01-0/R-05 |
2005 |
ARMATURE ASSEMBLY 761 A23 T/M (16 NOS.) |
US$ |
125,235.04 |
COMPLETED |
210 |
19/0013/01-0/2-2005 |
2005 |
SHAFT WITH PLUG OF 761 A23 T/M (12 NOS.) |
US$ |
6,372.00 |
COMPLETED |
211 |
19/0029/01-0/2-2005 |
2005 |
R/KITS FOR HITACHI 395 HP T/ MOTORS (22 NOS.) |
US$ |
84,875.56 |
COMPLETED |
212 |
19/0046/01-0/4-2005 |
2005 |
EXCITING FIELD COIL W/POLE PIECE 761 A19 T/M |
US$ |
50,100.00 |
COMPLETED |
213 |
19/0083/01-0/2-2005 |
2005 |
ARMATURE ASSEMBLY- OF 395 HP TOR (30 NOS). |
US$ |
49,458.00 |
COMPLETED |
214 |
19/0094/01-0/2-2005 |
2005 |
F/COIL COMMUTATOR OF 761 A19/A23 T/M (100 NOS) |
US$ |
31,700.00 |
COMPLETED |
215 |
19/0101/01-0/2-2005 |
2005 |
CARBON BRUSH OF 395 HP HITACHI T/M (3600 NOS.) |
US$ |
56,916.00 |
COMPLETED |
216 |
19/0105/01-0/2-2005 |
2005 |
F/COIL COMMUTATOR OF 761 A19/A23 T/M (200 NOS) |
US$ |
62,424.00 |
COMPLETED |
217 |
19/0014/01-0/2-2006 |
2006 |
ARMATURE SHAFT- A23 & 395 HP T/M (12 & 15 NOS.) |
US$ |
17,647.00 |
COMPLETED |
218 |
PTCL 1398 |
2006 |
S.S AERIAL CABLS |
US$ |
1,612,020.84 |
COMPLETED |
219 |
19/0081/01-0/2-2006 |
2006 |
ARMATURE ASSY OF D-29 T/M (34 NOS) |
US$ |
367,434.36 |
COMPLETED |
220 |
19/0084/01-0/2-2006 |
2006 |
COMMUTATOR&C/BRUSHES 395 HP T/M (6&540 Nos) |
US$ |
31,924.00 |
COMPLETED |
221 |
19/0099/01-0/2-2006 |
2006 |
ARMATURE & SHAFT-395 HP T/M (18 & 12 NOS) |
US$ |
244,044.00 |
COMPLETED |
222 |
LESCO 606 (PO 2110) |
2006 |
DISCONNCTORS |
US |
518,711.20 |
COMPLETED |
223 |
STG-6-22 (PO 631) |
2006 |
DISCONNECTORS |
US$ |
616,930.00 |
COMPLETED |
224 |
ADP-66 LOTS IV & VI |
2006 |
132 KV AND 66 KV CTS/Pta |
US$ |
2,208,375.00 |
COMPLETED |
225 |
19/0104/01-0/1-2006 |
2006 |
R/KIT,COIL AND LEAD ASSEMBY OF D-29 T/M |
US$ |
168,329.04 |
COMPLETED |
226 |
SIEMENS H-28 |
2006 |
Hydaulic Press with all Tools and Accessories |
Euro |
3,416.00 |
COMPLETED |
227 |
SIEMENS SUNDER |
2007 |
145KV 20KA 200-100/5-5-5A Single Phase CTs |
US$ |
10,140.00 |
COMPLETED |
228 |
19/0127/01-0/1-2006 |
2007 |
COMM.R/KIT-D-29-ARMATURES ETC. OF 395-HP T/M |
US$ |
252,588.44 |
COMPLETED |
229 |
GEPCO/33 |
2007 |
132/11.5 KV, 31.5/40 MVA POWER TRANSFORMERS |
US$ |
1,890,619.00 |
LEFT BY SUPPLIERS |
230 |
PESCO 20 |
2007 |
132/11.5 KV, 31.5/40 MVA POWER TRANSFORMERS |
US$ |
1,833,592.00 |
LEFT BY SUPPLIERS |
231 |
ADB-07 LOT III & VII |
2007 |
132 KV CTS & PTS |
EURO |
157,740.00 |
COMPLETED |
232 |
PESCO 36 |
2008 |
132 KV CTS & PTS |
US$ |
442,620.00 |
LEFT BY SUPPLIERS |
233 |
19/0016/01-0/1-2008 |
2008 |
CABLE & Bearing Housing Assy and,Perm Putty |
EURO |
58,830.92 |
COMPLETED |
234 |
19/0033/01-0/1-2008 |
2008 |
GLASS TYPE ETC. |
US$ |
6,228.00 |
COMPLETED |
235 |
ADB-09 LOT IX (A&B) |
2008 |
500 KV, 220 KV AND 312 KV POST INSUTLAORS |
EURO |
193,824.40 |
COMPLETED |
236 |
19/0047/01-0/1-2008 |
2008 |
ARMATURE OF T/MOTORS 761 A19 |
EURO |
169,986.05 |
COMPLETED |
237 |
19/0055/01-0/1-2008 |
2008 |
ARMATURE OF T/MOTORS 761 A23 |
US$ |
421,136.10 |
COMPLETED |
238 |
19/0126/Spl-4/4-08 |
2008 |
Starting Gen: Main Alternator Cable Assy, (DLW) |
EURO |
60,241.56 |
COMPLETED |
239 |
19/0150/Spl-4/4-08 |
2008 |
Auxiliary Generator of Chinese Locos |
EURO |
47,478.88 |
COMPLETED |
240 |
19/0151/Spl-4/4-08 |
2008 |
Main Alternators, Exciter Cable Assy: (DLW) |
EURO |
55,993.89 |
COMPLETED |
241 |
19/0160/01-0/1-2008 |
2008 |
High Friction Brake Shoes |
US$ |
248,172.32 |
COMPLETED |
242 |
SIEMENS PAKISTAN |
2008 |
132 KV, 20KA, 0.2 Class CTs ratio 200-1001/5-5 A, 15VA |
EURO |
35,786.10 |
COMPLETED |
243 |
19/0109/01-0/2-2008 |
2008 |
C/B Holder Connectors, Cable Assy, C/ B C/End -Armature Shaft etc. |
EURO |
22,762.50 |
COMPLETED |
244 |
IESCO PO 54 (TENDER 155) |
2009 |
145 & 66 KV PTS |
US$ |
97,762.00 |
COMPLETED |
245 |
HESCO PO 02-0023 |
2009 |
145 KV CTS/PTS |
EURO |
288,900.00 |
COMPLETED |
246 |
NTDC GALLOP |
2009 |
145 KV CTS |
US$ |
259,495.65 |
COMPLETED |
247 |
PESCO/12 |
2009 |
145 KV CT and PTS |
US$ |
438,750.00 |
COMPLETED |
248 |
19/0009/01-0/1-2009 |
2009 |
Commutator,395 HP T/Motor- Cable Assy A23 T/M |
EURO |
72,738.60 |
COMPLETED |
249 |
19/0108/01-0/2-2009 |
2009 |
REWINDING KITS FOR HITACHI 395 HP T/MOTOR |
US$ |
126,032.15 |
COMPLETED |
250 |
19/0099/01-0/2-2009 |
2009 |
Spares for Chinese Traction Motor ZD-109 BP |
US$ |
43,612.26 |
COMPLETED |
251 |
19/0110/01-0/2-2009 |
2009 |
ARMATURE ASSEMBLY OF 395HP T/M (30 NOS). |
US$ |
147,504.24 |
COMPLETED |
252 |
19/0108/01-0/2-2009 |
2009 |
Rewinding Kit 395 HP T / Motor Armature |
US$ |
126,032.15 |
COMPLETED |
253 |
19/0110/01-0/2-2009 |
2009 |
Armature Assembly T/Motor 395 HP T/M |
US$ |
11,528,244.00 |
COMPLETED |
254 |
19/0009/01-0/2-2009 |
2009 |
Commutator Assembly 395 HP & A-23 T/M |
EURO |
72,738.60 |
COMPLETED |
255 |
HESCO-ADB-02 |
2010 |
132 KV AND 66 KV CTS & PTS |
US$ |
296,760.00 |
COMPLETED |
256 |
PESCO-14 |
2010 |
132 KV INSULATORS |
US$ |
39,900.00 |
COMPLETED |
257 |
GEPCO 9-63 |
2010 |
132 KV, 40 KA, CTS |
EURO |
58,140.00 |
COMPLETED |
258 |
PESCO-ADB-02 |
2010 |
132 KV, 40 KA, CTS |
US$ |
289,560.00 |
CIOMPLETED |
259 |
PESCO ADB-08 |
2010 |
STATIC SINGLE & THREE PHASE AND LT MDI METERS |
US$ |
3,831,187.40 |
LEFT BY SUPPLIERS |
260 |
TLM-01 |
2011 |
SPACER AND VIBERATION DAMPERS |
EURO |
40,270.00 |
LEFT BY SUPPLIERS |
261 |
ADB-50 LOT IX |
2011 |
500 AND 132 KV INSULATORS |
US$ |
72,050.00 |
COMPLETED |
262 |
NOR-15A |
2011 |
145 KV BUS AND LINE ISOLATORS |
US$ |
436,950.00 |
UNDEDR TESTING |
263 |
NOR-16 (LOT-1) |
2011 |
132 KV CTs 1200(IA) (P-205:05) &132 KV PTs (P-206:05) |
CNY |
2,113,440.00 |
COMPLETED |
264 |
LESCO 58 |
2011 |
145 KV PTs Single Phase |
CNY |
644,400.00 |
COMPLETED |
265 |
19/0085/01-0/2-2011 |
2011 |
Armature Assembly 395 HP T/Motor |
CNY |
6,084,549.90 |
COMPLETED |
266 |
19/0080/01-0/2-2011 |
2011 |
ARMATURE R/KITS & COMMUTATOR S OF 395 HP T/M |
US$ |
74,560.46 |
COMPLETED |
267 |
19/0047/01-0/2-2011 |
2011 |
Rewinding Kits- D-29 T/ Motor |
CNY |
912,648.55 |
COMPLETED |
268 |
19/0034/01-0/2-2011 |
2011 |
CABLE ASSEMBLIES- A-23 T/MOTORS |
US$ |
19,003.50 |
COMPLETED |
269 |
IES-GS-1/MJ/961 (MJ Corp) |
2011 |
132 KV L/ CTs,(P-90), 132 KV T/CTS (P-90), 132 KV PTs (P-129:) |
CNY |
1,225,500.00 |
COMPLETED |
270 |
19/0087/01-0/2-2012 |
2012 |
Rewinding Kits- 761 A23 T/M. |
CNY |
1,172,665.00 |
COMPLETED |
271 |
19/0095/01-0/2-2012 |
2012 |
Armatures, B/Housing (C/E) and Cable Assy. A-23 |
CNY |
5,156,592.00 |
COMPLETED |
272 |
19/0100/01-0/2-2012 |
2012 |
REWINDING KITS D-29 TRACTION MOTOR |
CNY |
1,599,075.00 |
COMPLETED |
273 |
19/0099/01-0/2-2012 |
2012 |
COMMUTATOR ASSY & R/Kits of HITACHI 395 HP |
CNY |
1,705,680.00 |
COMPLETED |
274 |
19/0098/01-0/2-2012 |
2012 |
COMMUTATOR ASSY D-29 |
CNY |
568,560.00 |
COMPLETED |
275 |
19/0058/01-0/2-2012 |
2012 |
CABLE ASSY,I/ BEARING STOPPER C/E, POLY GLASS TAPE 1″ |
CNY |
101,611.56 |
COMPLETED |
276 |
SSE/PO-DITG/28 |
2012 |
132 KV P.Ts with accessories (P-129: 85) |
CNY |
140,100.00 |
COMPLETED |
277 |
SIEMENS MOMINPURA (LESCO) |
2012 |
145KV, 40KA CTs and PTs |
US$ |
55,785.00 |
COMPLETED |
278 |
PO 19-0008/01-0/2-2013 |
2013 |
FREQUENCY MOTOR & EXCITOR GQC |
CNY |
362,560.00 |
COMPLETED |
279 |
P.O # 00101 (AL AMIN) |
2013 |
132 KV single phase CTs & PTs |
US$ |
154,320.00 |
COMPLETED |
280 |
SIEMENS (HESCO 7 &10) |
2013 |
145 KV, 40 KA CTS & 145 KV PTs |
US$ |
190,026.00 |
COMPLETED |
281 |
SIEMENS (JDW) |
2013 |
145 KV, 40 KA CTS & 145 KV PTs |
US$ |
297,960.00 |
COMPLETED |
282 |
SIEMENS (NOORPUR-IESCO) |
2013 |
145 KV, 40 KA CTS & 145 KV PTs |
US$ |
20,280.00 |
COMPLETED |
283 |
SIEMENS RYK |
2014 |
145 KV CTS /PTS |
US$ |
136,620.00 |
COMPLETED |
284 |
AL-AMIN |
2014 |
145 PTS |
US$ |
19,266.00 |
COMPLETED |
285 |
SIEMENS (JDW ADDL.) |
2014 |
145 KV, 40 KA CTS & 145 KV PTs |
US$ |
51,204.00 |
COMPLETED |
286 |
PO 19/0039/01-0/2-2013 |
2013 |
POLY GLASS BANDING TAPE 1″ |
CNY |
18,231.00 |
COMPLETED |
287 |
PO 19/0035/01-0/2-2013 |
2013 |
AC AUXILIARY GENERATORS (DLW CHINA) |
CNY |
407,880.00 |
COMPLETED |
288 |
PO 19/0048/01-0/2-2013 |
2013 |
ARMATURES OF EMD D-29 & GE 761 A 23 T/MOTORS |
CNY |
7,024,806.00 |
COMPLETED |
289 |
PO 19/0004/01-0/2-2014 |
2014 |
POLY GLASS BANDING TAPE I” |
CNY |
54,693.00 |
COMPLETED |
290 |
PO 19/0024/SR-150/3-2014 |
2014 |
Armature Assembly D-29 Traction Motor |
CNY |
2,738,358.00 |
COMPLETED |
291 |
PO-19/0014/01-0/2-2014 |
2014 |
Armature Assembly 761 A19 T/M |
CNY |
1,153,600.00 |
COMPLETED |
292 |
PO-19-0063/SR-150/4-2014 |
2014 |
Bearing Housing (C/End) |
CNY |
105,183.60 |
COMPLETED |
Frame Head (P/End) |
293 |
PO-19-0039/01-0/1-2014 |
2014 |
Rewinding Kit D-29 T/M |
CNY |
618,000.00 |
COMPLETED |
294 |
PO-19-0021/01-0/2-2014 |
2014 |
Poly Glass Binding Tape 1” |
CNY |
112,500.00 |
COMPLETED |
295 |
PO-19/0081/SR-150/3-2014 |
2014 |
Armature Assembly 395 HP T/M |
CNY |
23,113,200.00 |
COMPLETED |
296 |
PO-19/0060/01-0-2014 |
2014 |
Armature Assembly D-29 Traction Motor |
CNY |
2,827,350.00 |
COMPLETED |
297 |
PO-19/0102/SR-150/2-2014 |
2014 |
Bearing Cover P/E, Inner Bearing Stopper C/E & Teflon Ring |
CNY |
360,706.00 |
COMPLETED |
298 |
SIEMENS (HAMZA) |
2014 |
132KV, 40KA, 200/1A, 15VA, 1 core single phase Metering CTs/PTs |
US$ |
43,560.00 |
COMPLETED |
299 |
NOR-29-2013 |
2014 |
145KV, single pole, 4-core and 3 Core CTs |
US$ |
88,305.00 |
COMPLETED |
300 |
19/0043/SR-150/2-2014 |
2014 |
Axle Finished Machine to drawing No. DE-1317 |
US$ |
36,944.04 |
COMPLETED |
301 |
19/0012/01-0/4-2014 |
2014 |
Axle Finished Machine to drawing No. DE-4695 RGE-24 |
US$ |
19,817.20 |
COMPLETED |
302 |
19/0042/01-0/1-214 |
2014 |
Axle AGE-30 to Drawing No. DE-60060 |
US$ |
36,412.56 |
COMPLETED |
303 |
AL-AMIN GEPCO PINGGAO |
2014 |
145 KV, 40KA, 2000 Amps. Three pole Single throw Bus Disconnectors SSS and Parallel Disconnectors |
CNY |
529,600.00 |
COMPLETED |
304 |
AL-AMIN GEPCO NORIT |
2014 |
145 KV, 40KA Single Phase Current Transformer ratio 1200:600:300/5-5-5-5A including Steel Supporting Structure, G/Bolts and Terminal connectors. |
USD |
126,555.00 |
COMPLETED |
145 KV, 40KA Single Phase Current Transformer ratio 200:100/5-5-5-5A including Steel Supporting Structure, G/Bolts and Terminal connectors. |
145 KV, Voltage Transformer ratio 132 KV/3.110.3 PTs Single Phase including Steel Supporting Structure, G/Bolts and Terminal connectors. |
305 |
PO-19/0058/01-0/2-2014 |
2015 |
Main, Inter Pole, Shaft 761 A-23, Bearing Housing and Cable Assy |
CNY |
1,677,396.20 |
COMPLETED |
306 |
PO-19-0002/SR-150/3-2015 |
2015 |
D.E Locomotives Cables |
EURO |
116,492.58 |
COMPLETED |
307 |
19/0027/01/0/3-2015 |
2015 |
Poly Glass Binding Tape 1” |
CNY |
69,000.00 |
COMPLETED |
308 |
19/0042/01-0/4-2015 |
2015 |
Sleeve Liner to Lower |
USD |
24,168.54 |
COMPLETED |
Bearing Cam Shaft |
309 |
ADB-IESCO/TR-IV/ICB-01/2014 (LOT-II) |
2015 |
132KV, 40KA 2000 AMPS, 110V DC, 3-Pole Circuit Breakers with extended creepage distance including SSS, foundation bolts and terminal connectors for 600mm horizontal Al: Conductors |
USD |
350,408.00 |
COMPLETED |
145KV, 40KA 2000 AMPS, 3-Pole Single throw Bus Dis Connectors (Parallel Type) with insualtor of extended creepage distance including SSS, foundation bolts and terminal connectors for 600mm horizontal Al: Conductors |
ADB-IESCO/TR-IV/ICB-01/2014 (LOT-III) |
132 KV Single Phase Surge Arrester substation class having insulator of extended creepage distance with SSS complete with mounting arrangement, foundation bolts and terminal connectors for 600 mm Hawthorn Conductor |
USD |
222,762.00 |
COMPLETED |
11KV Surge Arresters with mounting arrangement |
132KV, 40KA, Single Phase Current Transformer ratio 200:100/5/5/5 A (3 Core) (Transformer CTs) with SSS foundation bolts mounting arrangement connectors for 600mm Hawthorn Conductor |
310 |
NOR-36-2014 (LOT-II) |
2015 |
132KV Current Transformers as per specifications P-205:2005, amended to date along grouting bolts, steel supporting structures and all other allied accessories. (Type LCW-145TAW2). |
USD |
232,128.00 |
COMPLETED |
132KV Voltage Transformers as per specifications P-206:2005, amended to date along grouting bolts, steel supporting structures and all other allied accessories. (Type JDCF-145TAW2). |
311 |
19/0031/01-0/2-2015 |
2015 |
Armature Assembly 395 HP |
CNY |
15,023,580.00 |
COMPLETED |
312 |
19/0034/01-0/3-2015 |
2015 |
Interpole 395 HP, Lead Assy D-29 & Commutator 395 HP T/M |
CNY |
1,101,482.00 |
COMPLETED |
313 |
19/0085/01-0/2-2015 |
2015 |
Armature 761 A-19 |
CNY |
1,326,640.00 |
COMPLETED |
314 |
19/0082/01-0/2-2015 |
2015 |
Coil Assy Inter Pole D-29, Interpole Coil S-Pole 395 HP, Interpole Coil N-Pole 395 HP & Frame Head 761A-23 |
CNY |
1,145,875.00 |
COMPLETED |
315 |
NOR-30D-2015 (LOT-II) |
2015 |
132 KV Post Insulators |
USD |
28,395.00 |
CANCELLED |
145 KV Post Insulators Stacks, having bushing with extended creepage distance, IEC type designation C8-650 complete with steel supporting structure, anchor bolts as per IEC 60273 & NTDC Specifications P-19:83 P-139:80, P-82:81, P-182:91 & P-176:2011 (Total height of Post Insulator + Steel supporting structure shall be 4.5m) |
145 KV Connectors as per NTDC Specification P-176:2011, BSH, BSHH & BSCCC |
316 |
19/0007/SR-100/1-2015 |
2015 |
Bearing, Dip Stick English Language Engraving |
USD |
35,411.40 |
COMPLETED |
317 |
19/0020/SR-100/3-2016 |
2016 |
D.E Locomotives Cables |
EURO |
175,899.98 |
COMPLETED |
318 |
19/0030/SR-100/1-2016 |
2016 |
Poly Glass Binding Tape 1” |
CNY |
18,231.00 |
UNDER SHIPMENT |
319 |
19/0014/01-0/2-2016 |
2016 |
Bearing Housing, Lead Assy”F”, Lead Assy “FF”, Lead Wire “AA”, Lead Wire “A”, Lead Assy “Y” Lead Assy”YY” |
CNY |
444,424.40 |
COMPLETED |
320 |
19/0066/SR-100/4-2016 |
2016 |
Armature 761 A-23 T/M and Armature Assy D-29 |
CNY |
5,909,316.00 |
PARTIALLY SHIPPED REMAINING BEINGSHIPPED IN FEB/MARCH, 2017 |
321 |
CPP-02M-2016 (LOT-III) |
2016 |
OPGW WITH AT LEAST 24 FIBERS QTY: 60 KM |
USD |
91,144.44 |
COMPLETED |
322 |
CPP-02M-2016 (LOT-V) |
2016 |
DISC INSULATORS 160KN QTY: 200,000 NOS. |
USD |
3,568,000.00 |
COMPLETED |
323 |
19/0083/SR-100/4-2016 |
2016 |
Cable 400mm (sqr) 1800 volts H+S Qty: 770 |
Euro |
30,979.21 |
COMPLETED |
324 |
19/0102/SR-100/4-2016 |
2016 |
Coil Assy No. 1, No.2, No.3, No. 4, Lead Wire “Y”, “YY” & Coil with pole Piece Commutating |
CNY |
1,753,884.00 |
COMPLETED |
325 |
Siemens (USM & GSM) |
2016 |
145 KV, 40KA, 200/1, Single Core Single Phase Metering CTs |
USD |
8,080.00 |
COMPLETED |
145KV, 40KA, 1600:800:400/1-1-1-1 4 Core Single Phase Line CTs |
326 |
Siemens (HSM-EXT) |
2016 |
132KV, 40KA, 200:100/1A 1 Core Single Phase Metering CTs |
USD |
43,560.00 |
COMPLETED |
132KV, 40KA, 1 Core Single Phase Metering Voltage Transformer |
327 |
RYK |
2016 |
145KV, 40KA, 200:100/1-1-1-1A, 4 Core Single Phase CTs |
USD |
11,055.00 |
COMPLETED |
145KV, 132KV,/3/110/3 2 Core VT |
328 |
19/0099/01-0/2-2016 |
2016 |
Coil Assy Main Field No. 1 Bottm |
CNY |
381,584.10 |
COMPLETED |
Coil Assy Main Field No. 2 Suspension |
Commutator Seasoned 395 HP T/M |
Shaft with Plug (Armature) |
Lead Assy: AA |
329 |
CPP-03M-2016 (LOT-III) |
2016 |
OPGW WITH AT LEAST 24 FIBERS QTY: 125 KM |
USD |
174,980.00 |
COMPLETED |
330 |
LESCO-195/PMU (PO-186) |
2017 |
DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 35 NOS. |
USD |
389,760.00 |
COMPLETED |
331 |
WPP-10-2016 (LOT-III) |
2017 |
AAAC GREELEY CONDUCTORS QTY: 1684 KM |
USD |
4,707,925.12 |
CANCELLED |
332 |
NOR-49R-2017 |
2017 |
Lead Acid Battery Bank, 48V 100AH, 200AH,300AH,500AH,550AH,560AH,600AH,700AH,750AH,1000AH, and 1250 AH (Plante Type) Qty: 31 Nos. |
USD |
392,106.00 |
COMPLETED |
333 |
LESCO-255/PMU (PO-242) |
2017 |
DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 25 NOS. |
USD |
314,025.00 |
COMPLETED |
334 |
ADB-TRANCHE-IV-IESCO-01(S)-2017 ICB-01(S) |
2017 |
FOR PROCUREMENT OF BATTERY BANKS 110 VOLTS 150AH, 55 CELLS QTY: 4 NOS. AND BATTERY CHARGER 110 VOLTS 150AH, 55 CELLS QTY: 4 NOS. |
USD |
63,600.00 |
COMPLETED |
335 |
NOR-55-2017 (LOT-II) |
2017 |
For Supply of 145KV Metering Currect Transformers Ratio: 1200-600/1A Qty: 45 Nos. & Marshalling Box CTS Qty: 15 Nos. |
USD |
130,155.00 |
COMPLETED |
336 |
CHINT/ADB-67-48VDC-Battery |
2017 |
FIAMM 48 Volt Battery Qty: 1 No. |
USD |
19,800.00 |
COMPLETED |
337 |
MARI PETROLEUM ORDER NO. 1010037977 |
2018 |
FOR SUPPLY OF DRY BATTERIES (METERING UPS BATTERIES REPLACEMENT) QTY: 40 PCS |
USD |
7,972.80 |
COMPLETED |
338 |
CPP-04M(R)-2017 (LOT-III) PACKAGE-1 |
2018 |
OPGW ALONG WITH AT LEAST 24 FIBERS QTY: 266 KM |
CNY |
3,056,579.60 |
COMPLETED |
339 |
NETRACON |
2018 |
Lead Acid Battery Bank, 48V, 24 Cells x SGL-15D Plante Type Dry Charged Qty: 01 No. |
USD |
5,680.00 |
COMPLETED |
340 |
NETRACON |
2018 |
Lead Acid Battery Bank, 48V, 24 Cells x SGL-15D Plante Type Dry Charged Qty: 02 Nos. |
USD |
11,360.00 |
COMPLETED |
341 |
F-02-BEC-0152-18 (BRITLITE ENGINEERING) |
2019 |
VRLA Battery Model: 12SP72 Voltage: 12 VDC, 70AH Qty: 128 PCS |
USD |
14,720.00 |
COMPLETED |
342 |
LESCO-339/PMU (PO-306) |
2019 |
DC Station Battery Banks 110 Volt 150 AH for 132 KV Grid Stations (Plante Type) QTY: 25 NOS. |
EURO |
263,775.00 |
COMPLETED |
343 |
TLM-06M-2018 |
2019 |
OPGW WITH AT LEAST 24 FIBERS QTY: 70 KM |
CNY |
807,406.95 |
COMPLETED |
344 |
PO-027-8 dated 22.10.2019 (Jaffer Brother) |
2019 |
OPGW Qty: 14 KM |
USD |
22,600.00 |
COMPLETED |
345 |
PO-027-8 dated 22.10.2019 (Jaffer Brother) |
2019 |
OPGW Qty: 10 KM |
USD |
16,006.00 |
COMPLETED |
346 |
TLM-08M-2019 |
2020 |
OPGW ALONGWITH AT LEAST 24 FIBERS QTY: 53 KM |
USD |
91,227.00 |
UNDER PROCESS |